Business Talent Group logo

Problem Solvers on Demand

go down

  • Consumer Goods
  • Financial Services
  • Industrial Goods
  • Life Sciences
  • Private Equity
  • Professional Services
  • Capabilities
  • Artificial Intelligence
  • Commercial Excellence
  • Data Science
  • Digital Health
  • Digital Transformation
  • Human Resources
  • Interim Executives
  • Life Science Strategy and M&A
  • Life Science Supply Chain, Manufacturing, and Quality
  • Life Science Transformation and Change Management
  • Market Access & Value
  • Mergers & Acquisitions
  • Marketing & Sales
  • Project Management
  • R&D and Clinical Solutions
  • Supply Chain
  • Transformations
  • 2024 High-End Independent Talent Report
  • Guide to Working with On-Demand Talent
  • The Interim Executive Advantage
  • 2023 Skills Index
  • 2022 Talent Lens
  • The Next-Gen Staffing Strategy for Professional Services Firms
  • Why You Need a Dynamic Digital Talent Strategy
  • BTG Enterprise
  • BTG Insights on Demand Podcast
  • On-Demand Talent vs. Traditional Consulting: Costs & Value Analysis
  • The Future of Work
  • Resource Types
  • Case Studies
  • Expert Q&As
  • Infographics
  • Press Releases
  • Research and Reports
  • Talent Resources

Project Management to Drive a Manufacturing Transition in Pharma

  • Share this Article

The supply chain team of an F200 pharma company embarked on a major initiative to transfer manufacturing of products across cell and gene therapy from a commercial site to a contract manufacturing organization (CMO), to develop, manufacture, and commercialize therapies in clinical trials and in-market. After a traditional consulting firm supported the first phase, the client wanted to exit the consulting engagement and own the transition internally. However, the client needed significant program management support to manage the transition effectively.

Business Talent Group (BTG) provided three skilled talent to step in quickly and help drive the transformation:

Program leader: A hands-on McKinsey, Accenture, and Booz project manager who had previously led multiple supply chain and manufacturing initiatives and had served in PMOs across industries including life sciences, pharmaceuticals, B2B services, telecommunications, and technology

Two skilled project managers: Both highly technical PMs, one with deep experience in life science regulatory affairs and logistics, and the other in business analytics, product management, and risk mitigation

Over the course of the project, the talent ensured tracking of 20+ workstreams, including:

  • Critical path analysis based on fully integrated cross-functional project plan development
  • Generation of project plans and insights based on customized project analysis and scenarios
  • Development of custom visuals and analytics detailing critical path
  • Internal and external coordination

Value: Three project managers with strong technical skills and functional experience to parachute into a key transformation

Previous Article

HR Leader to Improve and Support a Talent Acquisition Strategy in IT

A leading IT services provider had recently implemented a new internal IT operating model, creating a need ...

Next Article

Change Management Strategy to Reorganize a Customer-Facing Team

The internal strategy and consulting group of an F500 pharma company was restructuring a customer-facing te...

Talk with BTG to learn more about our on-demand talent.

Most Recent Articles

Project Manager for a Post-Merger Biotech Integration

When a large pharmaceutical firm acquired a biotech company spanning the US and China, the Director of Quality and Global Lead for End-to-End Integration needed a project manager to integrate...

Hands-On Execution Support to Transition to an Internal Team

Seven months after acquiring a multi-billion-dollar company and using a strategy consulting firm for the pre-close and post-close integration, the board and executive teams of an F100 company...

A Perfect-Fit Interim Executive

A private equity firm with $4.5 billion+ in assets under management was looking for an interim CFO to lead a portfolio company’s finance team through the carve-out of two business units. The...

Transformation Strategy and Leadership

A PE-backed European specialty chemicals company was seeking a transformation leader to quickly and thoroughly map out and execute the separation of a business unit, in preparation for a potential...

ESG Expert to Establish a Convenience Retailer’s Office of Sustainability

The leadership team of a Fortune 500 convenience store chain recognized the importance of maturing their Environmental, Social, and Governance (ESG) approach and wanted to establish an office of...

Targeted HR Expertise for One Part of a Larger Integration

A global pharmaceutical company acquired a large company, and though company leaders had managed smaller integrations through an integration management office (IMO), they needed broader...

A leading it services provider had recently implemented a new internal it operating model, creating a need to fill 100 open roles across the organization. to meet this acquisition target, the..., the internal strategy and consulting group of an f500 pharma company was restructuring a customer-facing team and needed strategic thinking to craft the vision and change management support. they....

Change Management Lead for a Supply Chain Transformation

An F500 pharmaceutical company required project management, change management, and communications support for a major supply chain transformation—including help tracking the progress of the teams...

A Project Manager with Exact-Fit Industry Experience to Drive a Pharma Supply Chain Transformation

The supply chain team of an F500 pharmaceutical company needed support with a multinational master data management (MDM) transformation. The VP of Global Supply Chain reached out to Business...

Two Change Management Consultants to Track Critical Improvement Projects

An F500 pharmaceutical company was seeking talent to fill a compound development team leader role to drive the communication and tracking of critical improvement projects led by internal...

Change Management for a Supply Chain and Manufacturing Overhaul Following a Spinoff

In support of an organizational spinoff requiring significant bandwidth and change management expertise, the supply chain strategic initiatives team at an F500 pharmaceuticals company sought a...

Exact-Fit Consultant to Drive Governance and Blueprint Development

The global communications team at a leading life science company was creating a blueprint to develop and strengthen the function in the coming years. To further the initiative, the team needed a...

PM for Complex Organizational Restructuring and Governance Implementation

A nonprofit foundation in the final stages of updating their Global Polio Eradication Initiative (GPEI) strategy shifted to a new structure that included expanded global program support, regional...

PM to Develop and Establish a 3-tier Life Sciences Governance Structure

An F500 life science client sought a seasoned strategy consultant with specific experience developing governance and operating models to establish a robust governance structure that detailed...

Team of Specialized Consultants for an Opportunity Assessment and Organizational Transformation

The global pricing team of an F500 life science firm wanted to innovate upon any outdated standard processes related to pricing and sought right-fit expertise to assess, support, justify, or...

Standing Up an Office of Privacy in Pharma

An F100 wholesale drug company was establishing an office of privacy and needed a subject matter expert to provide guidance for the stand-up process, as well as expertise on compliance and data...

A Skilled Project Manager to Implement a New Operational Framework

A large European life science organization needed to implement a new organizational and operational framework intended to standardize and optimize how the company handles alliances—including...

Dynamic and Scalable Project Management Resourcing for a Clinical Transformation

The clinical development group of an F500 pharma company was undergoing a transformation to improve clinical processes by eliminating waste, reducing complexity, and deliver cost savings and value...

Intelligent Automation Expert to Identify Opportunities for AI Application

A global fintech and payments company sought an intelligent automation and IT systems expert to evaluate process roadmaps and determine opportunities for AI, intelligent automation, and machine...

  • Share this Hub

manufacturing project management case studies

OUR METHODOLOGY

Our proprietary Duration-Driven® Methodology is what distinguishes us from other companies.

It is the foundation of our success and essential to the continuing success of all the projects we support.

manufacturing project management case studies

OUR APPS & SOFTWARE

Video demos, download our latest e-book.

manufacturing project management case studies

In this e-book, we’ll analyze the top ERP implementation obstacles and explore solutions to overcome these hurdles and move your project towards a successful completion.

OUR SERVICES

PMAlliance provides immediate project and portfolio management solutions that can transform the way your company manages projects, enabling you to achieve consistently successful results.

OUR TRAINING

Our consulting services.

manufacturing project management case studies

CASE STUDY SPOTLIGHT

A trio of industry-leading insurance subsidiary firms relied on PMAlliance to apply our proven portfolio management methodology to gain control over their existing projects and ensure they could meet upcoming compliance deadlines.

Challenges:

  • Firm timelines
  • Priorities out of focus
  • Inaccurate timelines

OUR EXPERIENCE

PMAlliance has been serving clients for 20 years. Our dedication to our client’s success remains our top priority and is what sets us apart. Your success is our success. Our proprietary methodology can be applied to any project in any industry.

APPS & SOFTWARE

Industries & project types.

A manufacturing company asked PMAlliance to redirect its efforts to implement new strategic projects that would increase sales and profitability. The project teams faced several significant challenges, including project plans without realistic scheduling or resource allocation, how to integrate the new projects with day-to-day tasks, and inadequate reporting to the project’s stakeholders. 

  • Unrealistic Project Plans
  • Integrating New Projects and Ongoing Work
  • Inadequate Reporting

Our mission is to  partner with our clients  to deliver a flexible combination of services that are tailored to their needs. PMAlliance uses a team of highly experienced and certified professionals to provide  project management consulting ,  project management training  and  project portfolio management (PPM)  services

OUR FOUNDERS

Why pmalliance, download our latest e-book.

manufacturing project management case studies

Home » About Us » Case Studies » Facility Startup Case Study | Manufacturing

Facility Startup Case Study | Manufacturing

heavy-manufacturing

Discuss Your Project, Portfolio & Training Needs

Data Entry Data Analytics

Optimize Project Data Analytics for New Product Launches

New product rollout projects can benefit from a data analysis strategy designed to help identify potential risks and opportunities. By gathering and analyzing the right

digital transformation project

Tips To Handle A Digital Transformation Project Emergency

Emergencies can occur at any time, even if that means a snowstorm walloping the region just as your digital transformation project reaches the rollout phase.

5 Things that Won't Happen in Your Next Project questions for stakeholders

Questions to Help Stakeholders Separate Wants from Needs

As you’re developing your project’s scope and timeline, you’ll likely receive requests that don’t clearly add value to the effort. Perhaps you’re working with high-level

  • Duration-Driven
  • Integrations
  • Schedule a Demo

Corporate Headquarters 3355 Lenox Road Suite 750 Atlanta, GA 30326 Toll-free (US) : 866.808.3735 International : +1.770.938.4947 Fax : 770.234.6997

PMP, PMI, PMBOK, CAPM are registered marks of the Project Management Institute, Inc. Copyright ©2022 PMAlliance. All rights reserved.  Legal  |  Sitemap  |  Contact

The Lean Post / Articles / Lean Management Case Studies Library

row of books on a shelf with spines showing

Lean Management Case Studies Library

By Chet Marchwinski

May 16, 2014

Learn how a variety of businesses and organizations used lean management principles to solve real business problems. We’ve arranged the examples in 16 categories to help you find the ones right for your environment.

Lean Management Examples from a Variety of Businesses

The following case studies of lean management principles in action show you how a variety of real businesses solved real business problems under diverse conditions.

We’ve arranged the stories in 16 categories to help you find the examples you need. There is some overlap. For instance, a “Lean Manufacturing” case study may also appear with “Privately Held Companies.”

Lean Manufacturing

  • Logistics, Supply Chain, and Warehousing
  • Lean Material Handling
  • Job Shops (Low-volume, High-mix Manufacturing); Tool and Die
  • Lean in Government
  • Lean Healthcare
  • Lean Accounting
  • Lean Construction
  • Lean in Office and Service Processes
  • Lean in Education

Problem Solving

Pull Systems

Culture Change

People Development

Privately Held Companies

Maintenance

Many of the executives who took part in these transformations are interviewed in LEI’s Senior Executive Series on Lean Leadership . After reading the case studies, be sure to get their personal perspectives on leading change. (Feel free to link to this page, but please respect the copyrights of LEI and journalists by not copying the articles.)

Are you doing something new or notable in the practice of lean management? Let us share what you learned with the lean community. For more information, contact LEI’s Director of Communications Chet Marchwinski at cmarchwinski at lean dot org

Thrustmaster Turns Around

Learn how Thrustmaster of Texas successfully adopted lean thinking and practices to make sustainable improvements in a short period of time, and how other manufacturers of highly engineered, low-volume products can follow their lead using the Lean Transformation Framework.

Lean + Circular Principals = a New True North for Manufacturer

SunPower’s lean journey resembled most others until it defined a new mission, a new True North by combining lean principals with those of the “circular economy” to launch what it is calling a CLean Transformation.

Sustain Your Lean Business System with a “Golden Triangle” After a medical device maker took a hit to margins to fight off global competition, it rebuilt them by lifting its lean operating system to a higher level and keeping it there with a “golden triangle” of sustainability.

Followup Story:

Manufacturing Balancing Act: Pull Versus ERP

In this follow-up to “Sustain Your Lean Business System with a ‘Golden Triangle,’” a case study about Phase 2 Medical Manufacturing, the company needs warehouse space to keep pace with sales growth spurred by the lean transformation. Instead, it expands a pull system by connecting the plan-for-every-part database that underpins one-piece flow production with ERP, typically associated with big batch production.

Cultivating a Lean Problem-Solving Culture at O.C. Tanner If you are in the “appreciation business”, you have to live it in your own workplace. For O.C. Tanner that meant a lean transformation had to show the company appreciated and wanted people’s problem-solving ideas. Here’s a report on that effort, including what worked and what didn’t.

Lean Partnership with Dealer Network Helps Vermeer Reduce End-to-End Inventory on Top Sellers

A lean transformation had taken heavy-equipment manufacturer Vermeer away from batch manufacturing, but batch ordering by dealers was delaying how quickly they got equipment like brush chippers. Learn how it  began converting its domestic industrial-line distribution network to lean replenishment, improving service to end customers and improving cash flow for Vermeer and its dealers.

Herman Miller’s Experiment in Excellence At Herman Miller, the lean management effort helps it build problem solvers as well as world-class office furniture. And as this case study shows, lean practices also helped it weather a brutal recession.

Build Your “House” of Production on a Stable Foundation Rigorous problem solving creates basic stability in a machining intensive facility.

A Journey to Value Streams: Reorganizing Into Five Groups Drives Lean Improvements and Customer Responsiveness An approach to creating a value -stream culture centered on autonomy, entrepreneurialism, and lean principles.

Change in Implementation Approach Opens the Door at EMCO to Greater Gains in Less Time A relatively quick, intensive project accelerates the rate of improvement and creates a showcase facility for spreading lean concepts.

Creating the Course and Tools for a Lean Accounting System A lean accounting implementation fills the frustrating disconnect between shop-floor improvements and financial statements.

For Athletic Shoe Company, the Soul of Lean Management Is Problem Solving After taking a lean tools approach to change, management re-organized the transformation around problem solving and process improvement to create a culture that engaged people while boosting performance.

Knife Company Hones Competitiveness by Bucking the Status Quo An iconic family-owned company turns to lean manufacturing to reduce costs by at least 30% to keep its U.S. operations open.

Lean Transformation Lives and Dies with Tools and Dies After a failed first try at just-in-time production , a company transforms tool maintenance, design, and fabrication to create a solid foundation for a second attempt.

Seasoned Lean Effort Avoids “Flavor-of-the-Month” Pitfall A look at how one company’s approach to what new tools it introduced, in what order, and how it prevented each new technique from being viewed as a “flavor of the month” fad.

Shifting to Value-Stream Managers: a Shop-Floor Revolution Leads to a Revolution in Plant Organization

Two years into a lean transformation, the low-hanging fruit has been plucked and progress has started to slow. Read how a Thomas & Betts plant recharged the transformation and reached higher levels of performance by using value-stream managers to span functional walls.

Using Plan-Do-Check-Act as a Strategy and Tactic for Helping Suppliers Improve

At Medtronic’s Neuromodulation business unit, the plan-do-check-act cycle is used on a strategic level to guide overall strategy for selecting and developing key suppliers as well as on a tactical level for guiding lean transformations at supplier facilities.

back to top

Logistics, Supply Chain, and Warehousing How a Retailer’s Distribution Center Exemplifies the Lean Precept “Respect for People,” and Reaps the Benefits

To make sure training engaged and resonated with people after previous attempts at a lean transformation faltered, LifeWay matched lean management tools and principles to its Bible-based culture and language.

Lean management case study series: Lean in Distribution: Go to Where the Action Is!

Starting with daily management walkabouts and standard work , this distributor had laid the groundwork for steady gains for years to come, just two years after its first kaizen workshop .

Putting Lean Principles in the Warehouse

Executives at Menlo Worldwide Logistics saw an opportunity to leapfrog the competition by embracing lean in its outsourced warehousing and receiving operations.

Lean Thinking Therapy Spreads Beyond the Shop

A company expands the lean transformation from the shop floor to international distribution, domestic shipping, and product development.

Sell One, Buy One, Make One: Transforming from Conventional to Lean Distribution

Large inventories to cover fluctuations in demand once characterized Toyota’s service parts distribution system — but no more. Here’s how one DC made the switch.

Material Handling

Following Four Steps to a Lean Material-Handling System Leads to a Leap in Performance

Creating the critical Plan for Every Part was one step in a methodical four-step implementation process to replace a traditional material-handling system.

Low-volume, High-mix Manufacturing; Tool and Die

The Backbone of Lean in the Back Shops

Sikorsky managers apply the lean concept of “every part, every interval” (EPEI) to level the mix in demand and create flow through a key manufacturing cell .

Landscape Forms Cultivates Lean to Fuel Growth Goals

With single-item orders 80% of the time, a low-volume, high-mix manufacturer decided single-piece flow cells were the best way decided the best way to add new products without having to constantly reconfigure production.

Lean Transformation Lives and Dies with Tools and Dies

After a failed first try at just-in-time production, a company transforms tool maintenance, design, and fabrication to create a solid foundation for a second attempt.

Canada Post Puts Its Stamp on a Lean Transformation

The “ inventory ” of mail already is paid for, so moving it faster doesn’t improve cash flow as in lean manufacturing. But Canada Post discovered that traditional batch-and-queue postal operations could benefit from lean principles.

Lean Thinking in Government: The State of Iowa

This story examines a kaizen event at a veterans home and more broadly at the lean effort in Iowa government.

Lean Thinking Helps City of Chula Vista with Budget Crunch

Goodrich Aerostructures’ Chula Vista plant introduces city government to lean thinking and practices so in order to maintain municipal services without resorting to further cuts in the workforce.

Using Lean Thinking to Reinvent City Government

Grand Rapids, MI, turns to lean principles to consolidate operations, eliminate wasted time and effort, and streamline to improve productivity while providing the quality of service that residents want.

Transforming Healthcare: What Matters Most? How the Cleveland Clinic Is Cultivating a Problem-Solving Mindset and Building a Culture of Improvement

The Cleveland Clinic reinvents its continuous improvement program to instill a problem-solving mindset and the skillset to solve everyday problems among the clinic’s thousands of caregivers.

View from the Hospital Floor: How to Build a Culture of Improvement One Unit at a Time

In order to do more and improve faster, the Cleveland Clinic is rolling out a methodology for building a “culture of improvement” across the 48,000-employee hospital system as this followup to the above story shows. Here’s how it works according to the people making the changes.

Dentist Drills Down to the Root Causes of Office Waste

Dentistry is a job shop that Dr. Sami Bahri is out to improve fundamentally for the benefit of patients through the application of lean principles.

Lean management case study series: Pediatric Hospital in Tough Market Pegs Growth to Lean Process Improvement

Lean improvement projects at Akron Children’s Hospital have saved millions of dollars, increased utilization of expensive assets, and reduced wait times for patients and their families.

Lean Design and Construction Project an Extension of Lean Commitment at Akron Children’s Hospital

Input from nurses, doctors, therapists, technicians, and patient parents heavily influenced design decisions..

“Pulling” Lean Through a Hospital

A thoughtful rollout of lean principles in the ER and eye-opening results created a “pull” for lean from other departments.

Best in Healthcare Getting Better with Lean

Mayo Clinic, Rochester, MN, stresses to doctors that the lean effort is aimed not at changing the moment of care, the touch moment between doctor and patient, but the 95% of the time when the patient is not in the doctor’s office

Fighting Cancer with Linear Accelerators and Accelerated Processes

Cross-functional team design and implement a lean process to dramatically increase the number of patients with brain and bone metastases receiving consultation, simulation, and first treatment on the same day without workarounds or expediting.

Massachusetts General Looks to Lean

A proton therapy treatment center, for many adults and children the best hope of beating cancer, applies lean principles to increase capacity.

New Facility, New Flow, and New Levels of Patient Care: The wait is over for patients at the Clearview Cancer Institute in Alabama

Physicians and staff have tirelessly reengineer processes and patient flow to eliminate as much waiting and waste as possible.

The Anatomy of Innovation

At a hospital in Pittsburgh, the emerging vision for the “hospital of the future” is described as giving the right patient, the right care, at the right time, in the right way, all the time.

Creating the Course and Tools for a Lean Accounting System

A lean accounting implementation fills the frustrating disconnect between shop-floor improvements and the financial statement.

Knife Company Hones Competitiveness by Bucking the Status Quo

An iconic family-owned company turns to lean manufacturing to reduce costs by at least 30% to keep its U.S. operations open.

Office and Service Processes

The “inventory” of mail already is paid for, so moving it faster doesn’t improve cash flow as in lean manufacturing. But Canada Post discovered that traditional batch-and-queue postal operations could benefit from lean principles.

Lean Landscapers

At an Atlanta landscaping company, lean practices are making inroads into a service industry in unusual yet fundamental ways.

LSG Sky Chefs Caters to New Market Realities

Business at airline caterer LSG Sky Chefs dropped 30% when airlines cut flights after the terrorist attacks on September 11, 2001. Sky Chefs responded with a rapid launch of a lean initiative.

leveraging Lean to Get the Oil Out

Aera Energy LLC, a California oil and gas company,  relies on lean principles to improve key processes, including drilling new wells, repairing existing ones, and maximizing the number of barrels of crude pumped each day.

Columbus Public Schools Use Process Thinking to Improve Academic Achievement.

Columbus, OH, public schools, experiment with lean tools and process thinking to remove wasteful activities that don’t help them help students learn.

Lean Inroads into Alabama Academia

How the University of Alabama in Huntsville integrated lean concepts throughout its industrial engineering curriculum.

Linking Lean Thinking to the Classroom

Value-stream mapping is one of many activities included in the Ford Partnership for Advanced Studies (Ford PAS), an academic program designed to link high-school classroom learning to the skills needed in college and business.

Build Your “House” of Production on a Stable Foundation

Rigorous problem solving creates basic stability in a machining intensive facility.

For Athletic Shoe Company, the Soul of Lean Management Is Problem Solving

After talking a lean tools approach to change, management re-organized the transformation around problem solving and process improvement to create a culture that engaged people while boosting performance.

Toothbrush Plant Reverses Decay in Competitiveness

The rapid introduction of a lean system, beginning with just-in-time production and pull, helps a highly automated Midwest plant fight off overseas competition by reducing lead times and inventory while augmenting the plant’s advantage in service.

A Journey to Value Streams: Reorganizing Into Five Groups Drives Lean Improvements and Customer Responsiveness

An approach to creating a value-stream culture centered on autonomy, entrepreneurialism, and lean principles.

Making Lean Leaders — Ariens internship program develops lean and leadership skills

Besides making snow-blowers, mowers, and string trimmers, Ariens Co., of Brillion, WI, makes lean leaders.

Starting with daily management walkabouts and standard work, this 84-year-old, family-owned distributor laid the groundwork for steady gains for years to come, just two years after its first kaizen workshop.

Sustain Your Lean Business System with a “Golden Triangle”

After a medical device maker took a hit to margins to fight off global competition, it rebuilt them by lifting its lean operating system to a higher level and keeping it there with a “golden triangle” of sustainability. You’ll recognize two elements of the triangle right away: visual control and standardized work . The third, accountability management or a kamishibai system, is probably less well known but just as critical.

Cultivating a Lean Problem-Solving Culture at O.C. Tanner

If you are in the “appreciation business”, you have to live it in your own workplace. For O.C. Tanner that meant a lean transformation had to show the company appreciated and wanted people’s problem-solving ideas. Here’s a report on that effort, including what worked and what didn’t.

Lean Thinking in Aircraft Repair and Maintenance Takes Wing at FedEx Express

A major check that used to take 32,715 man-hours was cut to 21,535 hours in six months. That translated into a $2 million savings, which dovetailed with the company’s emphasis on reducing costs during the recession.

Construction

Input from nurses, doctors, therapists, technicians, and patient parents heavily influenced design decisions—from incorporating emergency room hallways that protect the privacy of abused children to the number of electrical outlets in each neonatal intensive care room.

Virtual Lean Learning Experience (VLX)

A continuing education service offering the latest in lean leadership and management.

Written by:

manufacturing project management case studies

About Chet Marchwinski

Chet has been a humble, unwashed scribe of the lean continuous improvement movement since books by Taiichi Ohno and Shigeo Shingo first hit North America in the 1980s. At LEI, he contributes to content creation, marketing, public relations, and social media. Previously, he also wrote case studies on lean management implementations in…

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Save my name, email, and website in this browser for the next time I comment.

Top 20 Project Management Case Studies [With Examples]

Top 20 Project Management Case Studies [With Examples]

Project management case study analyses showcase and compare real-life project management processes and systems scenarios. These studies shed light on the common challenges that project managers encounter on a daily basis. This helps project managers develop effective strategies, overcome obstacles, and achieve successful results. 

By leveraging project management case studies , organisations can optimise their operations by providing insights into the most effective approaches. With effective implementation of these case studies, strategies, and methodologies, ensuring successful project completion is achievable.

Criteria for Selection of Top 20 Case Studies

The top 20 case studies are selected based on significance, impact, challenges, project management strategies, and overall success. They provide diverse insights and lessons for project managers and organisations.

1. The Sydney Opera House Project

Ads of upGrad blog

The Sydney Opera House Project is an iconic example of project management case studies as it faced multiple challenges during its construction phase. Despite facing leadership changes, budget overruns, and design failures, the project persevered and was completed in 1973, a decade later than planned. The Opera House stands as a symbol of perseverance and successful project management in the face of humankind.

2. The Airbus A380 Project

The Airbus A380 Project is a project management case study showcasing the challenges encountered during developing and producing the world’s largest commercial aircraft. The project experienced massive delays and impacted costs of more than $6 billion, with several issues arising from the manufacturing and delivery process, outsourcing, and project coordination. 

However, the Airbus A380 was successfully launched through carefully planned project management strategies, delivering a world-class aircraft that met customer expectations.

3. The Panama Canal Expansion Project 

The Panama Canal Expansion Project serves as a compelling case study, illustrating the management’s encounters in expanding the capacity of the Panama Canal. The project included multiple stakeholders, technological innovations, environmental concerns, and safety challenges. 

4. The Boston Central Artery/Tunnel Project

The Boston Central Artery/Tunnel Project serves as a project management case study of a large-scale underground tunnel construction project. It successfully addressed traffic congestion and was completed in 2007. The project was completed in 2007, with numerous hurdles delaying progress like complexity, technology failure, ballooning budgets, media scrutiny, etc.

5. The London 2012 Olympics Project

The London 2012 Olympics Project stands as a successful project management case study, showcasing the management of a large-scale international sporting event. This project involved the construction of a new sports infrastructure, event logistics and security concerns. The project was successfully accomplished, delivering a world-class event that captivated the audience.

6. The Hoover Dam Bypass Project

The Hoover Dam Bypass Project was a construction project in the United States of America that intended to alleviate traffic from the Hoover Dam by building a new bridge. Completed in 2010, the bridge spans across the Colorado River, connecting Arizona and Nevada and offers a safer and more efficient route for motorists.

7. The Golden Gate Bridge Seismic Retrofit Project

The Golden Gate Bridge Seismic Retrofit Project is a case study example constructed in San Francisco, California. Its objective was to enhance the bridge’s resilience against earthquakes and aftershocks. Completed in 2012, the project included the installation of shock absorbers and other seismic upgrades to ensure the bridge’s safety and functionality in the event of a major earthquake.

8. The Hong Kong-Zhuhai-Macau Bridge Project

The Hong Kong-Zhuhai-Macau Bridge Project is a massive case study that intends to connect Hong Kong, Zhuhai and Macau with a bridge-tunnel system of 55 kilometres. Completed in 2018, the project required massive funds, investments and innovative engineering solutions, providing a new transport link and boosting regional connectivity.

Check out our  free courses  and upskill yourself.

9. The Panama Papers Investigation Project

The Panama Papers Investigation Project is a global case study of journalistic investigations into offshore tax havens. It involved leaked documents from Mossack Fonseca, a Panamanian law firm. Coordinated by the International Consortium of Investigative Journalists, the project resulted in major political and financial repercussions worldwide, garnering widespread media attention.

10. The Apple iPhone Development Project

The Apple iPhone Development Project started in 2004, aiming to create a groundbreaking mobile device. In 2007, the iPhone transformed the industry with its innovative touchscreen interface, sleek design, and advanced features. This project involved significant research, development, marketing, and supply chain management investments.

Learn  Management Courses  from the World’s top Universities. Earn Masters, Executive PGP, or Advanced Certificate Programs to fast-track your career.

11. The Ford Pinto Design and Launch Project

The Ford Pinto Design and Launch Project was a developmental project intended to create an affordable, fuel-efficient subcompact car. Launched in 1971, because of its fuel tank design, it became infamous for safety issues. The project was rigged for ethical and safety concerns, lawsuits, and recalls.

12. The Deepwater Horizon Oil Spill Response Project

The Deepwater Horizon Oil Spill Response Project was a response to the largest oil spill in US history, caused by an offshore drilling rig explosion in 2010. This crisis response project utilised a waterfall project management approach, where the project team followed a pattern of planning, executing, monitoring, and closing phases. 

13. The NASA Challenger Space Shuttle Disaster Project

  The NASA Challenger Disaster Project was a tragic space exploration mission in 1986, resulting in the loss of all seven crew members. Extensive investigations revealed design and safety flaws as the cause. This disaster prompted NASA to address decision-making processes and improve safety cultures.

14. The Three Gorges Dam Project

  The Three Gorges Dam Project was a large-scale infrastructure project developed in China that aimed to build the world’s largest hydroelectric dam on the Yangtze River. Completed in 2012, it encountered environmental, social, and engineering challenges. The dam currently offers power generation, flood control, and improved navigation, but it has also resulted in ecological and cultural consequences.

15. The Big Dig Project in Boston

The Big Dig Project was a transportation infrastructure project in Boston, Massachusetts, intended to replace an old elevated highway with a newer tunnel system. Completed in 2007, it serves as one of the most complex and costly construction endeavours in US history. Despite facing many delays, cost overruns and engineering challenges, the project successfully improved traffic flow and urban aesthetics but also resulted in accidents, lawsuits, and financial burdens.

Our Top Management Programs & Articles

16. The Uber Disruptive Business Model Project

  The Uber Disruptive Business Model Project was a startup that introduced a new ride business model that disrupted the taxi-cab industry by connecting riders with drivers via a mobile app. Launched in 2010, this project required innovative technology, marketing and regulatory strategies and faced legal actions and ethical challenges related to labour, safety, and competition. Uber has since then dominated the market with its ride-sharing business plan.

17. The Netflix Original Content Development Project

The Netflix Original Content Development Project was an initiative created to launch its original content for its platform. This launch by the online streaming giant in 2012 was a huge success for the company. The project required huge investments in content creation, distribution and marketing and resulted in award-winning shows and films that redefined the entire entertainment industry’s business model.

18. The Tesla Electric Car Project

The Tesla Electric Car Project was a revolutionary project that aimed to compete for its electric vehicles with gasoline-powered vehicles. The project required a strong project management plan that incorporated innovation, sustainability, and stakeholder engagement, resulting in the successful launch of the Tesla Roadster in 2008 and subsequent models. Tesla has one-handedly revolutionised the entire automobile industry on its own. 

19. The Johnson & Johnson Tylenol Crisis Management Project:

The Johnson & Johnson Tylenol Crisis Management Project was a case study in crisis management in 1982. The project required quick and effective decision-making skills, stakeholder communication, and ethical leadership in response to the tampering of Tylenol capsules that led to deaths. 

20. The Airbnb Online Marketplace Platform Project  

The Airbnb Online Marketplace Platform Project was a startup that created an online platform which connected travellers with hosts offering short-term rental accommodations in flights. The project required innovative technology, user experience design and stakeholder management. Airbnb’s success has led to the disruption of the hospitality industry and inspired many other project case study examples of sharing economy platforms.

Explore our Popular Management Courses

Future developments in project management.

Future developments in project management include all the insights on the increased use of artificial intelligence, agile methodologies, hybrid project management approaches, and emphasis on sustainability and social responsibility, along with many more developing ideas that will address the evolving market innovations. 

Key Takeaways from the Case Studies

The project management case study examples illustrate real-life examples and the importance of project management in achieving project success. The cases show the use of innovative technologies, tools, techniques, stakeholder engagement, crisis management, and agile methodologies. 

Project Management also highlights the role of ethical leadership and social responsibility in project management. To learn more and more about case studies, upGrad, India’s leading education platform, has offered an Advanced General Management Program from IMT Ghaziabad that will equip you with in-demand management skills to keep up with the changing trends!

Profile

Keerthi Shivakumar

Something went wrong

Our Trending Management Courses

  • PG Programme in Management - Duration 11 Months
  • Post Graduate Diploma in Management - Duration 2 Years

Management Skills to Master

  • Consumer Behavior Courses
  • Supply Chain Management Courses
  • Financial Analysis Courses
  • Introduction to FinTech Courses
  • Introduction to HR Analytics Courses
  • Fundamentals of Communication Courses
  • Art of Effective Communication Courses
  • Introduction to Research Methodology Courses
  • Business Communication Courses
  • Mastering Sales Technique Courses
  • Fundamentals of Journalism Courses
  • Economics Masterclass Online Courses
  • Microeconomics Online Courses

Our Popular Management Course

Management

Frequently Asked Questions (FAQs)

Project Management is extensive planning, executing, monitoring and closing of a project before its deadline. Project management ensures accuracy and efficiency across all organs of a project, right from its inception to its completion.

Project Management case studies are real-life examples of projects to put an insight into all the tools, techniques and methodologies it provides.

The role of a project manager is to ensure that all day-to-day responsibilities are being met by the resources deployed in a certain project. They have the authority to manage as well as lead the functioning members as well.

Related Programs View All

Certification

16 Hrs Live Expert-Led Sessions

14 Case Studies, 3 Mock Tests

View Program

manufacturing project management case studies

Master's Degree

Dual Credentials

manufacturing project management case studies

Job Assistance

16+ Hrs Expert-Led Sessions

5 Simulation Exams, 8 Mock Tests

24 Hrs Live Expert-Led Training

Earn 24 PDUs and 24 SEUs

36 Hrs Live Expert-Led Training

Premium 2000+ Question Bank

32 Hrs Live Expert-Led Training

Earn 32 PDUs and SEUs

manufacturing project management case studies

Complimentary On-Demand Course

1 Year SAFe® Community Membership

88 Hours On-Demand Learning

Training by top CSTs

16 Hrs Live Expert-Led Training

Earn 16 PDUs and 16 SEUs

manufacturing project management case studies

AACSB accredited

Training by Top-Notch SPCs

manufacturing project management case studies

3 Day Leadership Summit in Dubai

manufacturing project management case studies

Ivy League School

manufacturing project management case studies

Executive PG Program

Offline Campus Experience

manufacturing project management case studies

PG Certification

6-10.5 Months

2500+ Students Enrolled

manufacturing project management case studies

EQUIS & AMBA Accredited

manufacturing project management case studies

Executive Coaching

Simulations, 5 Mock Tests

manufacturing project management case studies

Instructor Led Model

16-Hrs Live Expert-Led Sessions

Earn 16 SEUs and 16 PDUs

16+ Hrs Expert-Led Training

manufacturing project management case studies

AMBA, AACSB & NIRF Accreditation

24+ Hrs Expert-Led Sessions

Simulation Exams, 24 PDUs

35 Hrs Live Expert-Led Training

35 PD Hrs, 35 CDUs & 35 PDUs

24-Hrs Live Expert-Led Sessions

Activities and Case Studies

8+ Hrs Expert-Led Sessions

Interactive Sessions, Activities

36+ Expert-Led Training

5 Simulation Exams, Projects

21 Hrs Live Expert-Led Training

Earn 21 CDUs and 21 PDUs

2-Day Live Expert-led Training

Simulations, 4 Mock Tests

16 Hours of Instructor-Led Sessions

Simulation Exams and Mock Tests

Earn 16 PDUs and 16 SEUs

24-Hrs Live Expert-Led Training

Earn 24 SEUs and 24 PDUs

Explore Free Courses

Study Abroad Free Course

Learn more about the education system, top universities, entrance tests, course information, and employment opportunities in Canada through this course.

Marketing

Advance your career in the field of marketing with Industry relevant free courses

Data Science & Machine Learning

Build your foundation in one of the hottest industry of the 21st century

Management

Master industry-relevant skills that are required to become a leader and drive organizational success

Technology

Build essential technical skills to move forward in your career in these evolving times

Career Planning

Get insights from industry leaders and career counselors and learn how to stay ahead in your career

Law

Kickstart your career in law by building a solid foundation with these relevant free courses.

Chat GPT + Gen AI

Stay ahead of the curve and upskill yourself on Generative AI and ChatGPT

Soft Skills

Build your confidence by learning essential soft skills to help you become an Industry ready professional.

Study Abroad Free Course

Learn more about the education system, top universities, entrance tests, course information, and employment opportunities in USA through this course.

Suggested Blogs

Management Process: Definition, Features & Functions

by Kamal Jacob

19 May 2024

What is The Nature and Scope of Management?

by Nitin Gurmukhani

Salary after BBA: BBA Salaries in India [For Freshers & Experienced in 2023]

05 Mar 2024

What are Motivation Theories? Top 5 Motivation Theories Explained

by Keerthi Shivakumar

23 Jan 2024

Career Development in HRM: Meaning, Stages, Process, Skills

24 Sep 2023

Disaster Management Project Ideas & Topics in 2024

15 Sep 2023

What is On the Job Training? Importance, Function and Types

14 Sep 2023

Tools of Financial Statement Analysis: Objectives, Techniques, Types

04 Sep 2023

Decision Making in Management: Importance, Types and Steps

24 Aug 2023

Capturing the true value of Industry 4.0

In the past five years, a select group of companies have started pulling ahead in their efforts to implement Industry 4.0 across their manufacturing networks . Leading manufacturers are now realizing significant value from data and analytics, AI, and machine learning (ML). However, a large majority remain stuck in pilot purgatory, struggling to capture the full potential of their transformation efforts or deliver a satisfactory return on investment.

While digital transformations are notoriously difficult to scale up  across networks of factories, the pressure to succeed is intense. Companies at the front of the pack are capturing benefits across the entire manufacturing value chain—increasing production capacity and reducing material losses, improving customer service and delivery lead times, achieving higher employee satisfaction, and reducing their environmental impact. Scaled across networks, these gains can fundamentally transform a company’s competitive position.

With so much at stake, manufacturers are putting significant time and money behind their digital transformations . These investments are paying off for some, but most remain unable to scale successful pilot programs or fully leverage new tools and technology to see meaningful returns.

This article explores some of the common pitfalls associated with digital transformations and how a more strategic and value-driven approach could help manufacturers in the race to get ahead.

Delivering value across every area of the factory

The digitally enabled factory of today looks very different from the leading factory of ten years ago. Advances in data and analytics, AI, and ML—and the array of technology vendors in the market—mean manufacturers can choose from hundreds of potential solutions and tech applications to improve their ways of working.

Implemented successfully, these solutions deliver irresistible returns. Across a wide range of sectors, it is not uncommon to see 30 to 50 percent reductions in machine downtime, 10 to 30 percent increases in throughput, 15 to 30 percent improvements in labor productivity, and 85 percent more accurate forecasting (Exhibit 1).

While digital transformations are notoriously difficult to scale up across networks of factories, the pressure to succeed is intense. Companies at the front of the pack are capturing benefits across the entire manufacturing value chain.

Digital transformations are revolutionizing all aspects of manufacturing, touching not just processes and productivity but also people. The right applications of technology can lead to more empowered decision making; new opportunities for upskilling, reskilling, and cross-functional collaboration; better talent attraction and retention; and improved workplace safety and employee satisfaction.

Customers see the impacts through reduced manufacturing lead times, right-first-time launch management, and improved customer service and complexity management. And, of course, there are the win–win advantages associated with reduced environmental impact, made possible through lower emissions and reduced waste and more efficient energy, water, and raw-material consumption.

These productivity, process, and people improvements are not easy to accomplish—especially across a network of individual manufacturing sites, each with its own site leadership, IT infrastructure, and workplace culture. It is not uncommon to hear of companies achieving impressive results through pilot programs at one factory site only to find themselves unable to replicate these local wins across their network.

This was the situation at a global industrial company. Facing a considerable ramp-up in demand—volume more than doubled over just three years, which translated to producing more than 50 million additional parts—the business embarked on an ambitious digital transformation at one factory. The goal was to increase overall equipment effectiveness (OEE) by ten percentage points and reduce product unit costs by more than 30 percent.

The project delivered: the factory was admitted to the Global Lighthouse Network , a World Economic Forum initiative, in collaboration with McKinsey, that recognizes leadership in the Fourth Industrial Revolution. The site started welcoming external visitors to showcase its transformation. But despite this achievement, it was unclear to the company how to take this local success story and replicate it across other sites.

Would you like to learn more about our Operations Practice ?

The common pitfalls of scaling digital transformations.

There are five common reasons why manufacturers are not succeeding on this journey.

Siloed implementation. By pursuing digital transformations as a theoretical exercise, many companies unwittingly set up independent delivery teams that are decoupled from business leaders, site operations, manufacturing excellence, and central IT. Others focus too much on replicating a single site experience, failing to appreciate wider network complexities.

Failure to adapt. By deploying a one-size-fits-all approach, manufacturers miss the opportunity to build in the customization and adaptation needed to leverage the unique circumstances, culture, and values of separate factory sites.

Analysis paralysis. Performing a full and deep up-front analysis of an entire network can leave a manufacturer out of steam before a transformation can get off the ground. Instead, robust, accurate-enough insights can be gleaned from a well-developed extrapolation methodology.

Technology-driven rather than value-driven. A technology-first rollout means that solutions are deployed without a clear link to real value opportunities, business challenges, or capability requirements. The result: undermining crucial buy-in from the people charged with making deployment work.

Letting the ‘perfect’ defeat the good. By waiting until a fully fledged, ideal-state data and IT/OT (information technology/operational technology) architecture is defined and implemented before rolling out Industry 4.0 solutions, manufacturers lose out on the shorter time-to-impact made possible through a proven and pragmatic minimal viable architecture.

A technology-first rollout means that solutions are deployed without a clear link to real value opportunities, business challenges, or capability requirements, undermining crucial buy-in from the people charged with making deployment work.

Three company archetypes join the race

Manufacturers playing catch-up to the leading companies generally fall into one of three company archetypes.

The cautious starters. These companies are investigating how to begin their digital-transformation journeys. They need help to identify the full value that Industry 4.0 can bring to their business and to develop a network-wide strategy and deployment road map.

The frustrated experimenters. These companies have started experimenting through pilot programs with some successes. However, they find themselves deploying technologies without a clear understanding of how to achieve financial ROI.

The ready-to-scalers. These companies are deploying solutions and technologies but remain unable to maximize the returns or scale at pace across their networks. They need to recalibrate by focusing on how to capture the full benefits of Industry 4.0 or how to accelerate rollout to respond to shifts in business and customer needs.

Slowing down to go fast

No matter where a company falls on the spectrum of archetypes, there is great value in slowing down and regrouping around a new, more targeted strategy aimed at maximizing the value of a digital transformation.

An important lesson from the few organizations that have succeeded in scaling digital innovations is how they started their impact journey. Before jumping headfirst into procurement and deployment, the leading companies spend time identifying the full potential of Industry 4.0—pinpointing high-leverage areas across the manufacturing value chain—and architecting a laser-focused digital-manufacturing strategy and deployment road map.

The first phase of this approach includes a network scan to identify the value at stake and a priority list of technology use cases, taking into consideration data, IT/OT, and organizational maturity. An accompanying road map can then build on this groundwork, defining the deployment strategy and targeted sites for initial rollout, followed by a network-wide rollout plan to reach scale.

Taking the time up front to perform a network scan to find opportunities for big wins and quick wins can create significant momentum for a digital transformation. As manufacturing sites begin to capture financial and operational value—not to mention the benefits associated with improved organizational capabilities, workforce satisfaction, customer service performance, and environmental impact—these returns can create a virtuous feedback loop where programs become self-funding and initiatives translate more quickly into competitive advantage.

Scaling success

It is this methodology that underpinned the approach taken by the industrial company mentioned earlier. Following its lighthouse success, the business needed to understand how and where to invest to maximize returns across its network. By performing a network scan on a subset of its manufacturing value streams across more than a dozen sites, it identified five sites that together represented around 80 percent of the value at stake. Further, it found that ten out of the 17 identified use cases for technology accounted for 75 percent of the potential impact.

With a sound value-capture deployment strategy in place, and after structurally investing in the required capabilities, the company was able to replicate the network scan approach across the rest of its manufacturing network and scale to other business areas. A senior stakeholder in the company said: “We essentially wrote the playbook for how to scale this into our other sites and are making great progress in these places—not only across our downstream production network but also within our upstream production sites, leveraging digital to reduce human interventions and increase compliance.”

Focus on real business needs and current performance challenges, and follow a “strengths upward” approach, building on solutions that have already worked well at individual sites and can be rolled out pragmatically across the network.

In another example, a global consumer company had been piloting digital innovations in a number of business units for some time, but with few ideas achieving much impact beyond the individual line or site. Company leaders recognized the need to clarify which digital solutions could contribute to overall business needs and priorities, and where to focus transformation efforts to implement solutions at scale.

Following two months of up-front analysis focused on eight prioritized sites from a network of more than 40 factories in Europe and North America, the company realized that about 20 sites accounted for 80 percent of the total savings potential. It also identified a prioritized portfolio of digital solutions, with about two dozen use cases having relevance across the entire network, and a dozen identified as “no regrets” priorities.

Crucially, the process has enabled the company to understand the level of readiness of its data and technology infrastructure and the investment required in technical, managerial, and transformational capabilities. The company came out of the two months with an aligned and value-oriented road map for rolling out a digital transformation across its network. The plan integrated both digital and traditional lean or Six Sigma improvements, accounted for resources and technology requirements, and reflected a clear strategy for building capabilities at scale. The company went on to deploy at scale across multiple sites, pursuing more than $100 million of identified savings.

The seven golden principles for getting the best out of Industry 4.0

Whether manufacturers are starting out on their digital-transformation journeys—or recalibrating their approach after false starts or failed attempts—the approaches adopted by leading companies point to seven golden principles for scaling a successful digital transformation.

Communicate well and often. Establish an effective engagement plan and regular communication with critical senior stakeholders, site leaders, and a cross-functional core team.

Scientist

Lighthouses reveal a playbook for responsible industry transformation

Be specific. Focus on real business needs and current performance challenges, and follow a “strengths upward” approach, building on solutions that have already worked well at individual sites and can be rolled out pragmatically across the network.

Segment, select, and syndicate. Segment the manufacturing network and select representative sites for an up-front network scan. Syndicate the extrapolation methodology up front to indicate how focused insights will be scaled to derive a networkwide analysis.

Formalize the value at stake. In each assessed site, describe the actual value at stake by linking the most applicable Industry 4.0 solutions or use cases with current digital readiness, data availability, and IT/OT architecture.

Develop a three- to five-year vision for the network. Describe the total value at stake from prioritized bundles of use cases to align business leaders on the ambition, and form a compelling change story  for the broader organization. An engaging visual representation of the key solutions can help to engage the broader organization with the vision (Exhibit 2).

Design a digital-manufacturing road map. Develop a prioritized rollout plan with a clear scaling strategy and articulation of the value to capture over time, integrating enablement of data and IT/OT architecture as well as resourcing requirements, capabilities, and change management.

Syndicate the vision and secure leadership buy-in. Circulate the business case and requirements with key stakeholders, aiming for a clear mandate from top leadership and close engagement on target setting and execution from site leaders.

Whether stuck in pilot purgatory or under mounting pressure to demonstrate returns, companies can become dispirited and discouraged. However, by taking just one or two months to slow down and develop a robust manufacturing strategy and deployment road map, companies can accelerate their Industry 4.0 transformations and chart a clear journey forward for the next few years.

Ewelina Gregolinska is an associate partner in McKinsey’s London office, where Rehana Khanam is a partner and Prashanth Parthasarathy is a senior expert; Frédéric Lefort is a partner in the Gothenburg office.

The authors wish to thank Søren Fritzen, Sven Houthuys, Regis Peylet, Mikhail Razhev, and Hariharan Vijaykumar for their contributions to this article.

Explore a career with us

Related articles.

Scientist

Toward smart production: Machine intelligence in business operations

" "

The mainstreaming of additive manufacturing

  • Leadership Team
  • Our Approach
  • PMO Services
  • Program & Project Managers
  • PM Training & Development
  • Case Studies
  • Our Culture
  • Employee Benefits
  • Job Opportunities
  • Benefits Realization Management Diagnostic
  • Project Management Maturity Guide
  • Guide to Agile Project Management
  • PM Maturity Assessment
  • Project Management as a Service (PMaaS) and Why It’s the Future

About PM Solutions

PM Solutions is a project management consulting firm that helps PMO, project, and business leaders apply project and portfolio management practices that drive performance and operational efficiency.

  • Co-Founder & Co-CEO J. Kent Crawford
  • Co-Founder & Co-CEO Deborah Bigelow Crawford
  • President, PM Solutions & PM College Bruce Miller
  • Vice President, Client Success, Eric Foss
  • Managing Director, HR & Administration, Karen Alfonsi
  • Director, Marketing and Communications, Carrie Capili

With our approach , companies can expect high-value, high-impact solutions, and measurable, sustainable results.

  • PMO Deployment, Operation, and Enhancement
  • Project Management as a Service (PMaaS)
  • Project Review & Recovery
  • Project Portfolio Management (PPM)
  • Project Management Maturity Advancement
  • Organizational Change Management
  • Project Management Methodology Implementation
  • Demand Management
  • Project Management Mentors
  • Resource Management
  • Vendor Management

Project & Program Managers

We can provide you with highly experienced program and project managers ; experts to help guide, lead, and support high-visibility initiatives.

PM Training & Development

PM College® provides corporate project management training and competency programs for clients around the world.

By Project Initiatives

  • Cost Reduction Initiatives (1)
  • Data Center Consolidation (1)
  • High-risk Capital Initiatives (1)
  • Infrastructure Program Management (0)
  • Manufacturing Facility Operations (1)
  • Mentoring (11)
  • Methodology (4)
  • New Product Development (1)
  • Organizational Change (6)
  • PMO Assessment (4)
  • PMO Deployment (4)
  • Process Improvement (7)
  • Program & Portfolio Management (10)
  • Project Audits (1)
  • Project Management Training (7)
  • Regulatory Compliance (1)
  • Resource Management (1)
  • Strategy Execution (1)
  • Systems Integration Deployment (0)
  • Troubled Project Recovery (3)
  • Vendor Management (2)

By Industry

  • Automotive (1)
  • Energy & Utilities (7)
  • Financial Services (2)
  • Human Resources (1)
  • Information Technology (5)
  • Insurance (5)
  • Manufacturing (6)
  • Pharma/Biotech (2)
  • Professional Services (2)
  • Research and Development (1)
  • Retail & Merchandise (1)
  • Security (1)
  • Benefits Realization (4)
  • Change Management (6)
  • IT Project Management (4)
  • Outsourcing Project Management (4)
  • Performance & Value Measurement (12)
  • Project Management Maturity (23)
  • Project Management Methodology (12)
  • Project Management Office (58)
  • Project Management Training (31)
  • Project Management Trends (50)
  • Project Manager Competency (18)
  • Project Portfolio Management (11)
  • Project Recovery (9)
  • Resource Management (5)
  • Strategy & Governance (14)
  • Articles (46)
  • Brochures (3)
  • eNewsletters (19)
  • Research (46)
  • Webinars (24)
  • White Papers (36)
  • contact us get in touch call: 800.983.0388

Home » Project Management Case Studies

Project management case studies, featured case studies, project management case studies & examples.

PM Solutions has a proven experience in providing solutions to a broad range of markets. Our project management case studies cover a wide variety of needs across a number of industries.

Bold EPMO Value Improvement for Insurance Company Preferred Mutual Comes from Process Agility and Innovation

“With agile & organizational change, we have reached out for professional assistance to improve.” — Michele Graham, SVP, Strategic Services

Improvements in Project and Portfolio Management Yield Immediate Returns

Dramatic increases in project execution capabilities and productivity resulted in $900,000 of operational cost avoidance during the current budget year.

We have a vested interest in demonstrating that the project management consulting services we provide actually improve our clients’ business performance in measurable ways. Here’s how.

  • eNewsletters
  • White Papers
  • PMO of the Year Award

Connect with Us

The project management experts®.

PM Solutions is a project management services firm helping organizations apply project management and PMO practices to improve business performance.

Toll-free (US): 800.983.0388 International: +1.484.450.0100 [email protected]

285 Wilmington-West Chester Pike Chadds Ford, PA 19317 USA

© 2012-2024 Project Management Solutions, Inc. All Rights Reserved. Privacy & Terms

Manufacturing Operations Management for Smart Manufacturing – A Case Study

  • Conference paper
  • First Online: 25 August 2020
  • Cite this conference paper

manufacturing project management case studies

  • Michael Meyer-Hentschel 20 ,
  • Oliver Lohse 20 ,
  • Subba Rao 21 &
  • Raffaello Lepratti 22  

Part of the book series: IFIP Advances in Information and Communication Technology ((IFIPAICT,volume 591))

Included in the following conference series:

  • IFIP International Conference on Advances in Production Management Systems

3907 Accesses

4 Citations

Industry 4.0 was introduced early in the last decade. That introduction spawned related concepts like “Smart Manufacturing” and digitalization, as well as a proliferation of digital manufacturing technologies for supporting systems. The industry experienced widespread puzzlement over how to apply these concepts in practice and which roles “Manufacturing Executions Systems” play and will play in this context.

This paper outlines the change from classical Manufacturing Execution System (MES), with a focus on manufacturing execution including data collection, to monolithic Manufacturing Operations Management (MOM) with an extension of the functionality regarding quality management, planning inclusive scheduling and a collaborative MOM, which stands out from its predecessors through broad horizontal integration and cloud applications.

These parameters lead to an evolution of the Collaborative MOM towards a MOM for Smart Manufacturing, which harmoniously combines, controls and regulates the interaction of technologies such as IIoT, RAD, AI, Edge Computing, Cloud with the MOM functions and therefore enables new production systems like a cyber-physical production system (CPPS).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
  • Available as EPUB and PDF
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
  • Durable hardcover edition

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Acatech – Deutsche Akademie der Technikwissenschaften e.V. Umsetzungsempfehlungen für das Zukunftsprojekt Industrie 4.0 (2013). https://www.bmbf.de/files/Umsetzungsempfehlungen_Industrie4_0.pdf

Alexakos, C., Kalogeras, A.: Exposing MES functionalities as enabler for cloud manufacturing. In: 2017 IEEE 13th International Workshop on Factory Communication Systems (WFCS), pp. 1–431. IEEE, 31 May–02 June 2017

Google Scholar  

Demartini, M., Galluccio, F., Mattis, P., Abusohyon, I., Lepratti, R., Tonelli, F.: Closed-loop manufacturing for aerospace industry: an integrated PLM-MOM solution to support the wing box assembly process. In: Ameri, F., Stecke, K.E., von Cieminski, G., Kiritsis, D. (eds.) APMS 2019. IAICT, vol. 567, pp. 423–430. Springer, Cham (2019). https://doi.org/10.1007/978-3-030-29996-5_49

Chapter   Google Scholar  

Jeschke, S., Brecher, C., Meisen, T., Özdemir, D., Eschert, T.: Industrial Internet of Things and cyber manufacturing systems. In: Jeschke, S., Brecher, C., Song, H., Rawat, D.B. (eds.) Industrial Internet of Things. SSWT, pp. 3–19. Springer, Cham (2017). https://doi.org/10.1007/978-3-319-42559-7_1

Kang, H.S., Lee, J.Y., Choi, S., et al.: Smart manufacturing past research, present findings, and future directions. Int. J. Precis. Eng. Manuf.-Green Tech. 3 (1), 111–128 (2016). https://doi.org/10.1007/s40684-016-0015-5

Article   Google Scholar  

Mantravadi, S., Møller, C.: An overview of next-generation manufacturing execution systems: how important is MES for industry 4.0? Procedia Manuf. 30 , 588–595 (2019). https://doi.org/10.1016/j.promfg.2019.02.083

Qiu, R.G., Zhou, M.: Mighty MESs. IEEE Robot. Automat. Mag. 11 (1), 19–40 (2004). https://doi.org/10.1109/MRA.2004.1275947

Tritchkov, I., Goetz, H.: Verification and validation of decentralized, self-organizing cyber-physical production systems: a blueprint process for testing cyber-physical production systems with self-properties. In: 2016 IEEE 1st International Workshops on Foundations and Applications of Self* Systems (FAS*W), pp. 112–117. IEEE (2016)

Filipov, V., Vasilev, P.: Manufacturing operations management - the smart backbone of industry 4.0. Int. Sci. J. “Ind. 4.0” 1 , 19–24 (2016)

Download references

Acknowledgment

This work was carried out with the knowledge and experience gathered from the project “Road to Digitalization” (R2D), which was supported by the Bavarian state ministry of economy, media, energy and technology and several companies.

Author information

Authors and affiliations.

Siemens AG, Corporate Technology, 81739, Munich, Germany

Michael Meyer-Hentschel & Oliver Lohse

Siemens Industry Software Inc., Digital Industries, Troy, MI, 48098, USA

Siemens AG, Digital Industries, 13623, Berlin, Germany

Raffaello Lepratti

You can also search for this author in PubMed   Google Scholar

Corresponding author

Correspondence to Oliver Lohse .

Editor information

Editors and affiliations.

University of Novi Sad, Novi Sad, Serbia

Bojan Lalic

University of Belgrade, Belgrade, Serbia

Vidosav Majstorovic

Ugljesa Marjanovic

ZF Hungária Kft., Eger, Hungary

Gregor von Cieminski

Tecnológico de Monterrey, Mexico City, Mexico

David Romero

Rights and permissions

Reprints and permissions

Copyright information

© 2020 IFIP International Federation for Information Processing

About this paper

Cite this paper.

Meyer-Hentschel, M., Lohse, O., Rao, S., Lepratti, R. (2020). Manufacturing Operations Management for Smart Manufacturing – A Case Study. In: Lalic, B., Majstorovic, V., Marjanovic, U., von Cieminski, G., Romero, D. (eds) Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems. APMS 2020. IFIP Advances in Information and Communication Technology, vol 591. Springer, Cham. https://doi.org/10.1007/978-3-030-57993-7_11

Download citation

DOI : https://doi.org/10.1007/978-3-030-57993-7_11

Published : 25 August 2020

Publisher Name : Springer, Cham

Print ISBN : 978-3-030-57992-0

Online ISBN : 978-3-030-57993-7

eBook Packages : Computer Science Computer Science (R0)

Share this paper

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

  • Publish with us

Policies and ethics

Societies and partnerships

The International Federation for Information Processing

  • Find a journal
  • Track your research

logo-TEC

SCM Case Studies With Examples

What is an scm case study.

  • Procurement

infographic: supply chain management case studies

  • Product lifecycle management (PLM)
  • Inventory management
  • Demand planning
  • Order management
  • Warehousing
  • Transportation
  • Customer service

What’s Included in SCM Case Studies?

  • Client profile —company type, industry, and a brief history and description of the company
  • The situation —the circumstances that initially caused the company to become interested in a new SCM solution
  • The challenges —the problems and issues the company was facing that an SCM solution could solve
  • The process —the heart of the case study, as it shows how the SCM vendor, reseller, or service provider—or TEC—performed its services in a way that met or exceeded the client’s goals and expectations
  • The results —the benefits to the client at the end of the day
  • Vendor/service provider profile —brief description of the vendor, reseller, or service provider—or TEC—including contact information

The Benefits of an SCM Case Study in the Selection Process

Because modern SCM software is generally quite complex, it can be difficult for companies to determine which SCM solution is the right one for their needs. Fortunately, there is a lot of documentation and research that companies can reference to assist them. As a category, SCM case studies can be of particular value because they describe how other companies overcame challenges inherent in the SCM software selection process. In the best case, organizations, such as manufacturing and distribution companies, can find SCM case studies that feature companies like theirs with similar needs and circumstances.

How TEC's SCM Case Studies Can Help You Find the Best-Fit SCM Software

TEC is a software service provider; we are not a vendor or reseller. As an industry-leading software advisory firm, we focus on three areas that are of critical importance to our clients:

  • evaluation and selection
  • implementation oversight
  • vendor/reseller contract negotiations

TEC case studies show how our advisory services helped companies of varying types, sizes, and industries succeed in all three areas.

TEC’s SCM Software Selection Process

Selecting enterprise software presents some significant issues. The complexity of today’s enterprise software can be a challenge for companies that lack the appropriate in-house expertise. Most companies are unused to cataloging their processes and goals and then matching them to software features and functions. And while vendors sell software every day, companies seldom make a software purchase, giving vendors a built-in advantage when it comes to contract negotiations. Finally, software implementation is a specialty of its own, requiring specific expertise and oversight in this process. As you can see right below, TEC’s software selection process provides assistance in all these areas with a proven methodology developed over hundreds of successful selection projects and implementations.  

  • Assess : Assess the client’s business processes and goals, gaps in key processes, and discover their functional requirements
  • Review : Review SCM solutions and vendor capabilities to meet the client’s business needs
  • Identify : Identify the shortlist of SCM vendors and their partner(s)
  • Demonstration : Assess SCM solution demonstrations scripted to the client’s business processes
  • Proposal : Create and distribute SCM request for proposal (RFP) to vendors to clarify deliverables and project total cost of ownership (TCO)
  • Reference : Evaluate SCM vendor and their partner(s) through reference checks from real-world clients on previous projects
  • Contract : Perform contract review and price negotiations on behalf of the client for cost savings
  • Implementation : Perform oversight and monitor the implementation of the SCM application(s) to enable successful transformation and business growth

TEC’s proven methodology is backed by our decision support software TECAdvisor , ensuring that every software selection decision is driven by data and is an impartial evaluation of the current enterprise software market.

Learn More with Our Free Library of SCM Case Studies

Refine results.

  • Enterprise Resource Planning (ERP) 536
  • Discrete Manufacturing ERP 127
  • Process Manufacturing ERP 122
  • Mixed-Mode ERP 112
  • ERP for Small Manufacturing Business 100
  • Distribution ERP 83
  • ERP for Service Industry 35
  • ERP for Small Business 33
  • Engineer-to-Order (ETO) 121
  • Supply Chain & Logistics 299
  • Supply Chain Management (SCM) 158
  • Inventory Management 87
  • Manufacturing Execution Systems (MES) 57
  • Merchandising Software 18
  • Supply Relationship Management (SRM) 29
  • Transportation Management Systems (TMS) 25
  • Demand Management Software 27
  • RFID Software 5
  • Warehouse Management Systems (WMS) 97
  • Business Intelligence & Data Analytics 247
  • Spreadsheet 1
  • Business Process Management (BPM) 100
  • Enterprise Performance Management 60
  • Business Intelligence (BI) and Data Management 181
  • Customer Relationship Management & Support 219
  • Call Center 6
  • Event Management 1
  • Proposal Management 10
  • Contract Management 2
  • Sales Force Automation Software 21
  • Customer Relationship Management (CRM) 185
  • Field Service Management (FSM) 80
  • Configure Price Quote (CPQ) 33
  • Benefits Administration 12
  • Compensation Management 6
  • Human Resources 24
  • Performance Management 14
  • Time & Attendance 11
  • Workforce Management 15
  • Learning Management Systems (LMS) 75
  • Talent Acquisition Software 14
  • Talent Management Systems 43
  • Human Capital Management (HCM) 83
  • Financial 130
  • Billing & Invoicing 17
  • Point of Sale (POS) 2
  • Accounting and Financial Software 85
  • Asset Management 122
  • Facility Management 6
  • Computerized Maintenance Management System 109
  • Asset Management (EAM) 97
  • Product Lifecycle Management (PLM) 115
  • Process PLM 15
  • Discrete PLM 16
  • Regulatory and Compliance PLM 26
  • Fashion PLM 22
  • Retail PLM 48
  • Information & Document Management 69
  • Document Management Systems (DMS) 58
  • Enterprise Content Management (ECM) 52
  • Content Management System (CMS) 17
  • IT & IT Security 57
  • Help Desk 6
  • Virtual Private Network (VPN) 1
  • Remote Access 3
  • Network Security 16
  • E-commerce 31
  • Web Content Management (WCM) 6
  • Communication & Collaboration 31
  • Collaboration 2
  • Project Management 8
  • Project and Process Management (PPM) 23
  • Marketing 23
  • Marketing Automation 23
  • Design/Creative 9
  • Computer-Aided Design (CAD) 9
  • Industry-Specific 3
  • Property Management 3
  • Manufacturing 41
  • Wholesale and Retail Trade 21
  • Food and Beverage Products 8
  • Chemical Products 5
  • Pharmaceutical and Botanical Products 4
  • Transportation 4
  • Construction 3
  • Motor Vehicles and Other Transport Equipment 3
  • Agriculture and Forestry 2
  • Health Care and Social Work 2
  • Hotels and Restaurants 2
  • Life and Natural Sciences 2
  • Mining & Quarrying 2
  • Public Administration and Defense 2
  • Publishing and Media 2
  • Telecommunications 2
  • Warehousing 2
  • Electronics and High-tech Components 1
  • Industry Independent 1
  • Insurance 1
  • Recreational, Cultural, and Sporting Activities 1

Publication Types

  • Blog Posts 1,216
  • White Papers 772
  • Case Studies 158
  • Industry Reports 65
  • Brochures 41
  • Software Reviews 40
  • Buyer's Guides 14
  • Datasheets 14
  • Accreditation Reports 6
  • Plex Systems 9
  • Pronto Software 7
  • Synergy Resources 6
  • Technology Evaluation Centers 6
  • Demand Management Inc. 5
  • Microsoft 5
  • Blue Yonder 4
  • AFS Technologies, Inc. 3
  • Bamboo Rose 3
  • MSM Solutions 3
  • AppFinity Software Corp. 2
  • Cadre Technologies, Inc 2
  • Cameleon Software 2
  • Chiron Technologies, Inc. 2
  • Dassault Systèmes 2
  • Habanero Consulting Group 2
  • LOGO Business Solutions 2
  • NGC (New Generation Computing) 2
  • Nucleus Research 2
  • Waer Systems Limited 2
  • Arena Solutions (a PTC Business) 1
  • Know the option you’re looking for? Type in the search field.

Increased Productivity through Automation

Top Publications

The Digital Manufacturing Operations Imperative (For All Size Businesses)

  • × Search Close Search
  • Success Stories

Actalent's Project Management Team Gets Multi-Site Plant Expansions Back on Track

Female project manager going over priorities with male worker.

This case study showcases Actalent’s wide range of expertise and capabilities: from project management, construction management and EHS programs to manufacturing, mechanical, and electrical engineering solutions.

Results at a Glance

Actalent resolved the client's biggest project concern in two months, more than 3 million hours of combined safety among all employees and consultants, implemented solutions to mitigate waste and delays, client profile.

A U.S.-based producer of pet food and pet products.

Market Overview

Forever seeking ways to improve production and speed- to-market, manufacturers in almost every industry are also contending with an ongoing lack of materials and equipment availability. Due to that scarcity, each manufacturer’s mission to avoid downtime and gain efficiencies thus becomes all the more critical yet challenging.

Also scarce is the skilled talent required to sustain growth in the face of these challenges.

The Challenge

The client was expanding wet and dry pet food production at multiple facilities across the country. A general contractor (GC) was overseeing the construction, along with all manufacturing, mechanical, and electrical engineering requirements.

This large-scale project, however, was quickly hampered by an overall lack of engineering quality and accountability on the part of the GC.

For example, improper quality control, with instances of improper system input and output checkout, led to multiple job stoppages and schedule pushes. On top of that, the GC’s poor documentation, poor communication, and seeming inability to problem-solve made these situations worse.

Engineering and construction talent soon began resigning from the project, having grown frustrated with the GC and weary of potential safety issues.

Unless resolved, these initial problems would eventually cascade into production delays, late deliveries, strained operations, increased attrition, higher costs, and decreased revenue.

The client turned to Actalent, a trusted partner in engineering talent solutions, to stabilize the project.

The Actalent Approach

After listening to and collaborating with the client, Actalent’s developed a solution rooted in quality and accountability.

First, Actalent assumed oversight of engineering and construction, including all consultants working on those aspects of the project.

That meant ensuring various systems, equipment, and processes -- including those related to electric utilities, water supply, waste-water treatment, supply chain management, parts tracking, ingredient batching, drying, coating, and packaging -- were designed, installed, implemented, and commissioned properly at each facility.

To achieve and maintain success, Actalent established the following: a detailed project schedule, rigorous but manageable safety protocols, meaningful performance metrics, open lines of communication, rigid delivery milestones, and the use of proper engineering designs.

In addition, Actalent also owned the recruitment, screening, onboarding, training, and performance of over eighty consultants -- including site managers – from both inside and outside project-area labor markets.

The Results

Actalent, upon implementing proper structure, oversight, training, and guidelines, had the client’s wet and dry food expansion back on track within two months. Even more remarkable, nearly three years later the project is ahead of schedule.

Actalent’s quality, accountability, transparency and communication, and overall problem-solving capabilities have been the key differentiators in this project’s success.

Here are several of the highlights from this turnaround:

  • The system for commissioning the bulk drying and ingredient batching systems, once among the biggest project concerns, was fixed within Actalent’s first two months.
  • Materials, equipment, and resources are now being sourced, tracked, and managed properly, thus mitigating waste and delays.
  • Kitchen Commissioning, the first major milestone, is about to be completed almost 50% faster than originally expected.
  • Across sites, the project has accrued hundreds of days without an injury, which equates to more than 3 million hours of combined safety among all employees and consultants.
  • Improved onboarding, safety orientation, training, and talent retention.
  • Identified, troubleshot, and implemented solutions to fill critical gaps in the explosion suppression system.
  • Established a monthly contractor performance review process.
  • Through committed communication, Actalent turned tension into alignment and collaboration between consultants, the GC, and subcontractors working on the project.

Roles Supported

  • controls engineer
  • electrical engineers
  • electrical field engineers
  • mechanical construction managers
  • mechanical engineers
  • packaging project engineers
  • process engineers
  • project managers
  • safety directors
  • site managers
  • utilities electrical engineers
  • CAD specialists
  • construction managers
  • electrical field representatives
  • engineering maintenance specialists
  • material handling specialists
  • mechanical field representatives

Projects Performed or Managed

  • construction management
  • electrical utility requirement design and coordination
  • water supply guidance
  • wastewater treatment package development
  • staging, installation, and commissioning of equipment and systems
  • GC and sub-contractor quality control
  • safety program implementation and oversight; review sub-contractors’ safety programs, OSHA Logs, EMR data
  • active workflow management
  • transformer installations
  • layout and staging of motor control centers
  • CAD design and drawing (includes 3-D drawings and revising incorrect GC drawings)
  • CAD database maintenance
  • contributing insights and guidance to 30% design reviews
  • fire protection
  • implementation of unit load conveyance
  • installation of the process and packaging equipment
  • mechanical utility loading for process systems

Urgent project needs? Connect with Actalent's Project Management Services team.

Relevant insights.

Female project manager presenting the new project SOP to increase performance.

Success Story

Desperately needed analysts were sourced, trained and job ready 75% faster using Actalent’s recruitment, engagement and performance oversight solution.

Close up of cheerful young woman receiving delivery takeaway food order from a delivery person

This Q&A addresses the history of PFAS in the food packaging and what a European ban on those chemicals would look like for that industry and its customers.

young woman looking into mirror putting on mascara

In this Q&A, Actalent Chemical Engineer and Regulatory Specialist Alison Fraser answers questions about the uses, risks, and broader implications of PFAS in cosmetics and personal care products.

banner-in1

  • Project Management

Top 15+ Project Management Case Studies with Examples 2024

Home Blog Project Management Top 15+ Project Management Case Studies with Examples 2024

Play icon

Having worked for more than 9 years in the dynamic field of project management, I would strongly refer to real-world case studies as invaluable resources for both budding and experienced professionals. These case studies provide critical insights into the challenges and triumphs encountered in various industries, illustrating the application of project management principles in practical scenarios.   I have curated the project management case studies as a part of this article in such a way that it delves into a selection of compelling case studies, ranging from the healthcare sector to infrastructure and technology. Each case study is a testament to the strategic planning, adaptability, and innovative problem-solving skills necessary in today's fast-paced business environment. These narratives not only highlight past successes but also offer guidance for future projects, making them essential tools for anyone eager to excel in project management.

What is Case Study?

A case study refers to an in-depth examination of a specific case within the real-world context. It is a piece of content that sheds light on the challenges faced, solutions adopted, and the overall outcomes of a project. To understand project management case studies, it is important to first define what a project is . A project is a temporary endeavor with a defined beginning and end, aimed at achieving a specific goal or objective. Case studies are generally used by businesses during the proposal phase. However, they are also displayed on the websites of companies to provide prospects with a glance at the capabilities of the brands. It can even serve as an effective tool for lead generation. In simple words, case studies are stories that tell the target audience about the measures and strategies that the organization adopted to become successful.

What is Project Management Case Study?

A project management case study is a piece of content that highlights a project successfully managed by the organization. It showcases the challenges that the organization faced, the solutions adopted, and the final results. Keep reading in order to explore examples of successful project management case studies.

Top 15 Project Management Case Studies and Examples 

Are you looking for some project management case study examples? If yes, here are some of the best examples you can explore. Let’s dive in! Before diving in, here is the list of top 15 project management case studies: 

  • Mavenlink Helps Improve Utilization Rates by 15% for BTM Global
  • Boncom Reduces Billing Rate Errors by 100%
  • whyaye! Reaches 80% Billable Utilization
  • Metova Increases Billable Utilization by 10%
  • Appetize Doubles Length of Forecasting Outlook
  • RSM Improves Client Satisfaction and Global Business Processes
  • CORE Business Technologies Increases Billable Utilization by 35%
  • Health Catalyst Improves Business Processes and Increases Consistency in Project Delivery
  • Optimus SBR Improves Forecasting Horizon by 50%
  • PlainJoe Studios Increases Projects Closing Within Budget by 50%
  • RPI Consultants Decreases Admin Time by 20%
  • CBI's PMO Increases Billable Utilization By 30%
  • Butterfly Increases Billable Time by 20%
  • TeleTracking Increases Billable Utilization by 37%
  • Taylors Improves Utilization Rates by 15%
  • Hospital El Pilar improves Patient Care With implementing Disciplined Agile
  • British Columbia’s Ministry of Technology and Infrastructure (MoTI)

1. Mavenlink Helps Improve Utilization Rates by 15% for BTM Global

The case study is all about how Mavenlink helped BTM Global Consulting to save hours of work and enhance utilization with resource management technology. BTM Global Consulting offers system development and integration services to diverse clients. The challenges that the company faced were that tools like Netsuite OpenAir and Excel spreadsheets were not able to meet the customization needs as the company grew. It impacted their overall productivity.

BTM Global saw the following benefits: 

  • 15% increase in utilization for project managers
  • 10% increase in companywide utilization
  • 4-hour resource allocation work reduced to 10 minutes
  • 100% Company-wide time tracking adoption

In order to overcome the challenge, the solution they adopted was to switch to Mavenlink. The result was that it increased the utilization of the company by 10% and enhanced project manager utilization by 15%. It also reduced resource allocation work from 4 hours to just 10 minutes.

2. Boncom Reduces Billing Rate Errors by 100% With Mavenlink

Boncom is an advertising agency that collaborates with different purpose driven brands to create goods worldwide. The challenge was that the company relied on several-point solutions for delivering client-facing projects. However, the solutions failed to offer the required operational functionality. An ideal solution for Boncom was to adopt Mavenlink. The result was that the billing rate error got reduced by 100%. Accurate forecasting became possible for Boncom, and the company could generate reports in much less time.

3. whyaye! Reaches 80% Billable Utilization with Mavenlink

Here are the top benefits whyaye got: 

  • 6% increase in utilization
  • Tripled company size
  • Doubled in number of new clients every quarter
  • Support through constant business scaling

whyaye is a digital transformation consultancy delivering IT transformation solutions to businesses operating in diverse sectors. The challenge was that whyaye used to manage resources and projects using tools such as emails, PowerPoint, and Microsoft Excel. However, with the growth of the company, they were not able to access project data or gain insights for effective management of the projects . The ultimate solution to this challenge was to make a switch to Mavenlink. The result was an increase in the utilization by 6%, doubling of new clients, tripling of the company size, and seamless support through business growth.

4. Metova Increases Billable Utilization by 10% With Mavenlink

If you are looking for a project planning case study, Metova can be the right example. Metova is a technology firm, a Gold Partner of Microsoft, and an advanced consulting partner of AWS. The challenge was that the company handled several projects at a time. However, its heavy dependence on tools like Google Sheets limited the growth capabilities of the organization. So, the company looked for a solution and switched to Mavenlink. The result was that it was able to increase its billable utilization by 10%, increase its portfolio visibility, and standardize its project management process.

5. Hospital El Pilar improves Patient Care With implementing Disciplined Agile

If you are looking for an example of one of the best hospital related project management case studies, then Hospital El Pilar can be the ideal one. Hospital El Pilar is a private hospital in Guatemala City, Guatemala, that provides comprehensive care to patients in various medical specialties. The challenge was that the hospital’s application development team faced several obstacles in managing and delivering projects, such as unclear priorities, a lack of visibility, little interaction with users, and competing demands. The solution that the team adopted was to use Disciplined Agile® (DA™), a flexible and pragmatic approach to project management that optimizes the way of working (WoW). The result was improved project outcomes, increased user satisfaction, greater transparency, and more trust from stakeholders and customers.

6. British Columbia’s Ministry of Technology and Infrastructure (MoTI) gets its principal corridor for transportation up in 35 days

Reconnecting Roads After Massive Flooding (2022) is a case study of how the British Columbia Ministry of Transportation and Infrastructure (MoTI) used a project management approach based on the PMBOK® Guide to restore critical routes after a catastrophic weather event. It is one of the examples of successful project management case studies you can look into. The challenge was that an atmospheric river caused severe flooding, landslides, and bridge collapses, cutting off the lower mainland from the rest of Canada2. The solution was to prioritize the reopening of Highway 5, the principal corridor for transportation of goods and people, by creating scopes, work breakdown structures, and schedules for each site3. The result was that Highway 5 was reopened to commercial traffic in 35 days, despite additional weather challenges and risks4. The construction project management case study we discussed demonstrated the benefits of flexibility, collaboration, and communication in emergency response.

7. Appetize Doubles Length of Forecasting Outlook with Mavenlink

Here the the benefits Appetize got with Mavenlink: 

  • Forecasting horizon increases to 12 weeks
  • Management of 40+ major projects per quarter
  • Support for rapid companywide scaling
  • Salesforce integration supports project implementation

Appetize is one of the leading cloud-based points of sale (POS), enterprise management, and digital ordering platform that is trusted by a number of businesses. The challenge of the company was that its legacy project tracking systems were not able to meet the growing needs of the company. They experienced growth and manual data analysis challenges. The solution they found was to switch to Mavenlink. The result was an increase in the forecast horizon to 12 weeks, support for effective companywide scaling, easy management of over 40 major projects, and Salesforce integration for project implementation.

8. RSM Improves Client Satisfaction and Global Business Processes with Mavenlink

RSM is a tax, audit, and consulting company that provides a wide array of professional services to clients in Canada and the United States. The challenge of the company was that its legacy system lacked the necessary features required to support their work- and time-intensive projects and delivered insights relating to the project trends. An ideal solution to this challenge was to switch to Mavenlink. The result was better to risk mitigation in tax compliance, improved client-team communication, templatized project creation, and better use of the KPIs and project status.

9. CORE Business Technologies Increases Billable Utilization by 35% with Mavenlink

Here are the top benefits CORE Business Technologies got with Mavenlink: 

  • Simultaneous in-progress projects doubled
  • 100% company-wide time entry compliance
  • 35% Increase in Billable Utilization
  • 50% Increase in Team Productivity

Another top project management case study is the Core Business Technologies. CORE Business Technologies is a reputed single-source vendor self-service, in-person, and back-office processing to the clients. It offers SaaS-based payment solutions to clients. The challenge faced by the company was that its tools like spreadsheets, Zoho, and Microsoft Project led to a hectic work schedule owing to a huge number of disconnected systems. The solution to the challenge was to switch to Mavenlink. The result was the enhancement of team productivity by 50%, time entry compliance by 100%, and enhancement of the billable utilization rate by 35%.

Discover the leading KnowledgeHut's Project Management Courses:

10. Client Success: Health Catalyst Improves Business Processes and Increases Consistency in Project Delivery with Mavenlink

Here are the top benefits Health Catalyst saw with Mavenlink:   

  • Consistency in Successful Project Delivery 
  • Improved Interdepartmental Communication 
  • Deeper Resource Data Insights 
  • Stronger Resource Forecasting

Health Catalyst is a company that delivers data and analytics services and technology to different healthcare organizations. The firm provides assistance to technicians and clinicians in the healthcare sector. The challenge of the company was that the tools like Intacct and spreadsheets that is used for project management were not able to provide the required data insights and clarity for better project management. It also limited effective resource management. The solution was to embrace Mavenlink. The result was better resource forecasting, enhanced interdepartmental communication, consistency in project delivery, and better resource data insights .

11. Client Success: Optimus SBR Improves Forecasting Horizon by 50% with Mavenlink

Optimus SBR is a leading professional service provider in North America. It offers the best results to companies operating in diverse sectors, including healthcare, energy, transportation, financial services, and more. The challenge was that legacy software tools that the firm used gave rise to project management issues. The company was not able to get a real-time revenue forecast or gain insights into its future financial performance. The solution that the company adopted was to switch to Mavenlink. The result was better data-driven hiring decisions, efficient delivery of remote work, and enhancement of the forecasting horizon by 50%.

12. Client Success: PlainJoe Studios Increases Projects Closing Within Budget by 50% With Mavenlink

Here are the benefits how Mavenlink helped PlainJoe: 

  • Improved data insights for project success
  • Enablement of fast shift to remote work
  • Improved budgeting
  • Increased rates in billing

PlainJoe Studios is an experimental design studio that focuses on digitally immersive and strategic storytelling. The company has a team of strategists, architects, and problem solvers to create value for the clients. The challenge of the company was that the manual processing of the company affected its ability to grow and manage the diverse project effectively. They lacked clarity about their project needs and profitability. The solution to deal with the challenge was to switch to Mavenlink. The result was an enhancement in the billing rates by 15%, better project closing within budget by 50%, better data insights for the success of different projects, and a faster shift to remote work.

13. Client Success: RPI Consultants Decreases Admin Time by 20% With Mavenlink

If you are looking for an example of one of the best software project management case studies, then RPI Consultants can be the ideal one. RPI Consultants offer expert project leadership and software consulting services for enterprise-level implementation of solutions and products. The challenge was that the task management solutions adopted by the company gave rise to a number of complications. It resulted in poor interdepartmental transparency and time-consuming data entry. The ultimate solution that the company embraced was to switch to Mavenlink. The result was a rise in the utilization rate by 5%, lowing of admin time by 20%, better forecasting and resource management, and a single source for gaining insights into the project data.

14. Client Success: CBI's PMO Increases Billable Utilization By 30% With Mavenlink

CBI is a company that is focused on protecting the reputations, data, and brands of its clients. The challenge that the company faced was that the solutions used were unable to meet the growing needs of the organization. The systems were outdated, data sharing was not possible, and time tracking was inconsistent. The solution to the challenge was to switch to Mavenlink. The result was better interdepartmental alignment, enhancement of time tracking to support business growth, an increase in the billable utilization rate by 30%, and detailed insights for a greater success of the projects.

15. Client Success: Butterfly Increases Billable Time by 20% with Mavenlink

Butterfly is a leading digital agency that provides digital strategy, website design and development services, and ongoing support to businesses across Australia. The challenge was that the different legacy systems used by the agency limited its capability of effective project management and reporting. The systems were time consuming and cumbersome. In order to deal with the challenge, the solution was to make a switch to Mavenlink. The result was the enhancement of billable time by 20%, fast reporting insights, enhancement of productive utilization by 16%, and better Jira integration.

16. Client Success: TeleTracking Increases Billable Utilization by 37% With Mavenlink

TeleTracking Technologies is a leading provider of patient flow automation solutions to various hospitals in the healthcare sector. The challenge of the company was that it used different systems such as Microsoft Excel, Sharepoint, MS Project, Jira, and Netsuite. The use of a variety of solutions created a number of challenges for the company. It had poor forecasting capability, an insufficient time tracking process, and unclear resource utilization. The solution was to switch to Mavenlink. The result was the enhancement of time tracking compliance by 100%, rise in hours to date by 18%, and enhancement of billable utilization by 37%.

17. Client Success: Taylors Improves Utilization Rates by 15% with Mavenlink

This is a perfect example of a construction project management case study. Taylor Development Strategists is a leading civil engineering and urban planning organization in Australia. The challenge that the company faced was that the systems that it used were not able to support the growth of the business. There were a lot of inefficiencies and limitations. The solution to the challenge was to switch to Mavenlink. The result was better global collaboration, an increase in the utilization rate by 15%, consistency of timesheet entry, and in-depth insights relating to utilization and project targets.

Top Cities where Knowledgehut Conduct Project Management Certification Training Course Online

Transform your management approach with our online agile courses . Discover how to adjust, cooperate, and create like never before.

Start Creating Your Project Management Case Study

Not that you have a detailed idea about project management case studies, it is time to prepare your own. When doing the project management case study exercise, make sure to focus on covering all the important elements. Clearly stating the challenges and the solutions adopted by the company is important. If you want to get better at project management, getting a PMP Certification can be beneficial.

Case Study Best Practices and Tips 

Best practice to write a case study

  • Involve your clients in the preparation of the case study. 
  • Make use of graphs and data. 
  • Mix images, texts, graphs, and whitespace effectively.

Project Management Case Study Template 

To create a well-crafted and highly informative case study template in the realms of project management, you should start by providing a brief overview of the client's company, focusing on its industry, scale, and specific challenges. Follow with a detailed section on the challenge, emphasizing the unique aspects of the project and obstacles faced. Next, you might want to describe the solution implemented, detailing the strategies, methodologies, and tools used. Then, you would need to present the results, quantifying improvements and highlighting objectives achieved. Finally, please conclude the case study with a summary, encapsulating key takeaways and emphasizing the project's success and its implications for future endeavors. By following this structure, you can present a comprehensive yet concise analysis that is ideal for showcasing project management expertise and insights. You can also refer to the template for crafting a better case study on project management – Template for writing case studies .

By now, you must have gained a comprehensive knowledge of preparing a project management case study. This article elaborately explains the significance of real life project management case studies as vital tools for demonstrating a company's expertise in handling complex projects. These case studies, showcasing real-world scenarios, serve as compelling evidence of a firm's capability to navigate challenges and implement effective solutions, thereby boosting confidence in potential clients and partners. They are not only a reflection of past successes but also a lighthouse guiding future project endeavors in the discipline of project management within the fields of construction, pharmacy, technology and finance, highlighting the importance of strategic planning, innovation, and adaptability in project management. If you are aspiring to excel in this field, understanding these case studies is invaluable. However, you would also need to learn from project management failures case studies which would provide a roadmap to mastering the art of project management in today's dynamic business landscape.

Frequently Asked Questions (FAQs)

In order to write a project management case study, keep everything brief but mention everything in detail. Make sure to write it with clarity and include graphs and images. 

A project study must include information about the client, how your company helped the client in resolving a problem, and the results.

The best-case studies on project management have been listed above. It includes BTM Global, Butterfly, Boncom, and more.

Profile

Kevin D.Davis

Kevin D. Davis is a seasoned and results-driven Program/Project Management Professional with a Master's Certificate in Advanced Project Management. With expertise in leading multi-million dollar projects, strategic planning, and sales operations, Kevin excels in maximizing solutions and building business cases. He possesses a deep understanding of methodologies such as PMBOK, Lean Six Sigma, and TQM to achieve business/technology alignment. With over 100 instructional training sessions and extensive experience as a PMP Exam Prep Instructor at KnowledgeHut, Kevin has a proven track record in project management training and consulting. His expertise has helped in driving successful project outcomes and fostering organizational growth.

Avail your free 1:1 mentorship session.

Something went wrong

Upcoming Project Management Batches & Dates

Course advisor icon

PharmTech

OR WAIT null SECS

  • Editorial Info
  • Editorial Contacts
  • Editorial Advisory Board
  • Do Not Sell My Personal Information
  • Privacy Policy
  • Terms and Conditions

MJHLS Brand Logo

© 2024 MJH Life Sciences ™ and Pharmaceutical Technology . All rights reserved.

Case Studies in Pharmaceutical Project Management

A technical forum featuring Catalent Pharma Solutions, SAFC, and Neuland Laboratories.

Effective project management is an invaluable competency in a successful outsourcing relationship. Catalent Pharma Solutions, SAFC, and Neuland Laboratories, offer examples of successful project management, respectively in blow/fill/seal operations, viral-product manufacturing, and real-time project management in API manufacturing.

Project management underpins successful relationships between contract technology and service providers and their sponsor companies. As pharmaceutical companies increase their level of outsourcing, it becomes increasingly important for contract technology and service providers to provide not only the technical capabilities needed to execute a given project, but the management skills to deliver a project on time, to specifications, and with the necessary communication to prevent or mitigate project delays. To illustrate the importance of project management in outsourcing, several industry members provided case studies on how to coordinate, organize, and implement a successful project. Participating in this technical forum on project management are Norman Weichbrodt, strategic account manager at Catalent Pharma Solutions; Nick Johnson, marketing manager at SAFC; and Saharsh Rao Davuluri, president of contract research at Neuland Laboratories.

Gregor Schuster/Getty Images

Blow/fill/seal manufacturing

Norman Weichbrodt, strategic account manager at Catalent Pharma Solutions

Catalent Pharma Solutions is a provider of drug and biologic development services, delivery technologies, and supply solutions. Effective project management is the cornerstone of being a complete provider of services ranging from development of new products to technical transfer of existing products. Building the proper project team and employing the correct methodology for handling a complex project is the foundation on which success is achieved.

In July 2010, Catalent was approached by a major pharmaceutical customer to transfer an ophthalmic product approved for sale in Europe to Catalent's blow/fill/seal (BFS) manufacturing site in Woodstock, Illinois. The successful technical transfer of the manufacturing process for this product would potentially lead, following FDA approval of the product already made in the European facility, to approval of the drug for manufacture and sale in the United States.

Project scope. The actual scope of this project was much larger for the Woodstock facility than a simple technical transfer. The project required the following:

  • A complete renovation of a formulation and filling suite, including a new separate air-handling system
  • Designing, building, and qualifying an automated formulation skid
  • Upgrading an existing BFS filling machine to match the capacity requirements for the product
  • Designing, building, and qualifying new vial molding and filling systems to duplicate the existing European design
  • Qualifying the room, formulation skid, BFS machine, and secondary packaging to produce stability and process-validation batches to support the customer's submission and approval timeline
  • Developing and approving the required documentation for supply-chain, manufacturing, and quality assurance functions to meet the production timeline
  • Analytical-method transfer for chemistry and microbial testing
  • Complete process-validation protocols, test plans, and final reports to meet the submission timeline.

Cross-functional teams. To manage a project of this scope, the Catalent New Product Development (NPD) group and the site-management team agreed to form a group of cross-functional resources. The team members served as the primary representative of their functional area for the project and were assigned for the duration of the project. The project team consisted of a project manager from NPD, an engineering project manager, a development scientist, an operations specialist, a validation specialist, a quality-assurance product specialist, a technical writer, and various contract resources as required. A strategic account manager had overall responsibility for the project team. The establishment and use of an expanded core project team of cross-functional resources was a new approach for Catalent's Woodstock facility, but the scope and timeline for this project and the Catalent goal of meeting customer needs required an innovative solution.

The project was divided into six major activities: the room, the formulation skid, the BFS machine, method transfer, secondary packaging, and documentation. The NPD project manager was the owner of the overall project timeline. Each major activity was included in a Microsoft project schedule and maintained by the project manager. The engineering project manager handled all activities involving the renovation of the filling suite, making use of contractors from design through construction and qualification. He also participated in the design and construction of the formulation skid, primarily focusing on the software development. The development scientist and the operations specialist focused on the design of the formulation skid and the interface of the skid with the BFS machine to ensure the system had the proper design and controls to replicate the process already being used in Europe. The validation specialist developed the installatoin qualification, operational qualification), and product qualification protocols and had oversight of all factory acceptance testing (FAT) and site-acceptance (SAT) activities. The technical writer and the quality-assurance product specialist worked with the NPD project manager to manage the change-control process for the project and to complete all the required documentation, including material specifications, standard operating procedures, and manufacturing batch records. The NPD Project manager also provided oversight of the analytical method transfer, development of secondary packaging materials, and the documentation of project activities.

Technology transfer. The technology-transfer process was initiated by creating a comparability document that detailed every aspect of the manufacturing process. The process used in the European manufacture was listed step by step in the document with Catalent's suggestions and capabilities side by side. A final agreement for each step was included and served as the approved path forward. The specifications for in-process testing at each stage of the formulation as well as finished-product specifications were included in the document. The formulation process required bulk sterilization of a multicomponent polymer base with a relatively tight viscosity range. Two APIs were combined in a second part of the formulation and transferred to the polymer solution by sterile filtration. Of course, the entire formulation skid required steam sterilization of the product path through the BFS machine and maintenance of the sterile boundaries for the product during the entire filling process. Electronic documentation of all temperatures, times, and controls for each process step also were also required.

Communication. The NPD project manager and the strategic account manager facilitated weekly calls with the original equipment manufacturers of the formulation and BFS equipment as well as construction meetings during that phase of the project. Weekly calls were held with the customer representatives who were in liaison with the project team. A standard methodology was used to ensure that the meetings had a structured agenda and minutes issued for review in a timely fashion. A joint Project Steering Committee was formed, which was comprised of customer senior leadership members, Woodstock site leadership members, and Catalent business-development members.

Project Steering Committee meetings were held every three weeks during the course of the project. A formal presentation was made at each meeting to discuss progress toward major milestones in the project plan. Strategic decisions were discussed and developed through the Project Steering Committee meetings, and the decisions were ultimately made by the joint project team. This management design reduced the cycle time for critical decision-making between the customer and Catalent.

Figure 1 (Catalent): A blow/fill/seal suite at Catalent’s Woodstock, Illinois, facility. (FIGURES 1-3 (CATALENT) ARE COURTESY OF THE AUTHOR)

An example of such decision making was approval of a change to the SAT/FAT strategy originally planned for the formulation skid. The formulation skid is a fully automated two-tank system with over 100 control and process valves that are actuated in approximately 20 sequences. When the software development lagged behind the construction of the hardware, the opportunity arose to do a mechanical FAT, ship the formulation skid to the Woodstock site, complete the installation and mechanical troubleshooting of the skid and wait for the software to complete the qualification as a SAT. This decision saved as much as six weeks in the project schedule and enabled Catalent to meet the customer's timeline for stability and process-validation manufacturing. It also resulted in a formulation system that is part of a robust technical transfer process from the customer through the NPD group to Catalent's commercial manufacturing team.

Execution. To date, all of the engineering, stability, and process-validation batches have met the in-process and final-product test specifications. With nine batches produced, there have been no out-of-specification results for bulk or final product. In addition, no human error deviations have occurred in the formulation and filling of these batches.

Figures 1–3 (Catalent) show the facility upgrade and project equipment after installation.

Figure 2 (Catalent): A blow/fill/seal cavity fill machine at Catalent’s Woodstock, Illinois, facility.

In summary, Catalent did not employ new or groundbreaking methodology for this project. However, supplying the proper structure and resources for a project team is the crucial first step in meeting a customer's timeline and supplying the customer with quality product, reliably supplied.

Figure 3 (Catalent): A fully automated formulation skid at Catalent’s Woodstock, Illinois, facility.

Viral product manufacturing

Nick Johnson, marketing manager at SAFC

This case study in project management involved the partnership between SAFC and Oncolytics Biotech, a biotechnology company headquartered in Calgary, Canada, which has developed a novel cancer treatment, Reolysin, based on a modified wild-type reovirus expressed in suspension-adapted human embryonic kidney cells (HEK 293). In 2007, Oncolytics partnered with SAFC's Carlsbad, California, site as part of the commercialization process for Reolysin. After officially announcing SAFC as the contract manufacturer for the project in early 2011, Oncolytics announced in November 2011 that validation studies were underway. Now in Phase III clinical trials, SAFC and Oncolytics have worked as partners to manage this project from the initial phases of identifying how to make the technology work through to making the consistent batches required for licensure. The current goal is to obtain a successful regulatory approval for Reolysin.

Project challenges. The production of the modified reovirus presented a significant manufacturing challenge. Not only was it going to be the first time for this type of product to be made on such a large scale, it also involved transferring technology from a contract development organization (CDO) in Canada to the SAFC site in Carlsbad. At the beginning of the project, there were four partners in different locations, including Oncolytics, its CDO, SAFC, and SAFC Biosciences in St Louis, which developed the novel media used in the production process.

SAFC Carlsbad already was filling the bulk product for clinical trials out of a product that was being made at another CMO in the United Kingdom. As the product progressed into later-stage clinical trials, the production was ramped up and transferred to Carlsbad, at first on a 40-L scale, and up to the present 100-L batches. The technology transfer was a whole new ballgame in terms of scale and complexity and required a new project team to be formed. On the SAFC side, this included a director of operations plus senior managers in manufacturing, quality assurance, quality control, and project management. Business-development support was also brought in when new scopes of work and new contracts needed to be worked out and finalized.

Despite the disparate locations, the communication between the teams in the different sites worked well with routine weekly conference calls and many coordinating activities carried out electronically. Some face-to-face meetings were essential, including the manufacturing representative and project manager visiting the CDO to address process scale-up. A week also was spent with all partners, including the CDO, watching the process and filming it so that it could later be used for operator training in Carlsbad.

The whole process took quite some time with many technical challenges, leading to a stop–start of operations from late 2008 through to 2009. By the end of 2009, however, sufficient clinical material had been made to continue with the trials, so there was less urgency from that perspective. Once the 100-L scale was reached, one or two batches were made per year until the program was ready to initiate process validation batches. Now that the product has advanced to conformance batches, three to six batches will be made per year.

Tracking progress. From a production standpoint, Gantt charts (i.e. charts used to show the project's schedule) are used for all SAFC projects. They are mapped out further than just a single department and include everything that might affect the timeline from the vendor through to the customer. The anticipated timings were all shared with the customer as well as the troubleshooting of possible technology-transfer issues that the technical team mapped. The team was tasked to look through historical data from the previous partnership to identify where there were areas for improvement and to help resolve issues quickly with input from both the SAFC team and the CDO. Specifically, SAFC Biosciences also helped by developing a custom growth media that increased the viral productivity and eased the purification process.

When SAFC inherited the contract, it already contained the required specifications that were used as an ultimate metric for success. The new goal became making and purifying the product to the required level for a commercial launch. After a number of changes to the process on the CDO's side and a few creative manufacturing approaches from SAFC, these specifications were exceeded and brought the project to the current point. Oncolytics is now in a position where accessing materials for its clinical needs is no longer a constraint, and the project has advanced into process validation in anticipation of commercial launch.

Issue resolution. One issue the team faced was the presence of an impurity that prevented the product from meeting specifications. The teams were brought together, and all the possibilities that might have led to the impurity were considered. From there, action items were distributed to the teams for them to pursue, including the review of historical data. This approach was successful as by the time of the next team meeting, the problem had been pinpointed. By adapting the process for the next batch slightly, a solution was found allowing the product to met specifications and the issue was resolved.

A key factor in the overall project's success was the customer relationship. In addition to the customer having a very good project manager, the relationship was developed based on trust and a common goal. Another key factor was ensuring that we had the resources needed to move the project forward. When the program moved into the process-validation phase, a second project manager was added to increase bandwidth. The way all parties worked together allowed the manufacturing to enter into conformance batches within a relatively short period of time with only a limited number of clinical batches having been completed.

Real-time project management

Saharsh Rao Davuluri, president of contract research at Neuland Laboratories

On-time execution of API project development is a challenge for manufacturers. Neuland Laboratories has designed its GuarD project-management system around the principles of critical chain project management (CCPM), a concept developed by Eliyahu Goldratt, a prominent management consultant, who introduced the theory of constraints business model. Unlike other project-management systems, CCPM emphasizes flexible start dates and shared project resources. CCPM also uses buffers as a shared project resource rather than an individual task resource, thus enabling the overall project to be completed on time without requiring the individual tasks to be completed on time.

Process and organization. Neuland is an API and contract manufacturer based in Hyderabad, India. Almost 80% of the company's products are sold into the US and European markets, and these product must meet strict regulatory standards. In a typical year, Neuland scientists complete 30–40 projects ranging from complete API development, production of starting materials, and development of alternate processes for new molecular or chemical entities, as well as a variety of contract-manufacturing assignments for pharmaceutical ingredients and peptides. Depending on their complexity, projects may require process chemistry, analytical chemistry, technology transfer, production, developmental quality assurance, supply-chain management, regulatory affairs support, and project-management services.

Figure 1: (Neuland). A screenshot illustrating how a project’s progress can be tracked and how a user can participate directly through the GuarD web portal. (FIGURE 1 (NEULAND) IS COURTESY OF THE AUTHOR)

Organizational framework and real-time monitoring. Under GuarD's CCPM approach, each project is broken down into its basic tasks by a cross-functional team. The project has a designated team leader, usually an experienced scientist from the process-chemistry department, and a project manager responsible for managing timelines and communications. The team leader is the technical head of the project and responsible for overall execution.

Once the project has been divided into the basic tasks and sub-tasks, the details are transferred to a Microsoft project software template. This ensures that all the dependencies, resource requirements, and tentative start and end dates are recorded. The project is not considered "live" until the cross-functional team signs off on the detailed project plan. The finalized project document is uploaded to a web portal, and managers update respective tasks and sub-tasks as the project progresses. Managers can make qualitative updates detailing how tasks are proceeding, or quantitative updates to help respective task managers track how long a task will take to complete. Teams are encouraged to make at least one status update per day.

The ability to make both qualitative and quantitative updates in the GuarD project-management system is highly useful. Personnel in downstream operations, and more importantly the client, get an accurate picture of progress upstream and can plan accordingly. Neuland's customers also can track a project's progress and participate directly through the GuarD web portal.

Benefits. A key advantage of the GuarD system is that its detail and interactive nature make it easier to promptly identify and manage delays at any step, thereby facilitating on-time completion. For example, when the process-chemistry department requires more time to complete their tasks, the project manager is immediately aware of the situation and can work with all task managers to identify opportunities downstream to recover that time. Although it is important for the project manager to investigate the reasons for the delay, the immediate focus is on finding ways to deliver a quality project on time. Solutions might include running additional shifts or vessels or staggering batches. In most cases, customers are invited to join these discussions and contribute to the solution based on their experience and priorities.

Neuland's project-management system helps its clients in several ways. It provides a platform of almost 100% transparency, providing more insight than weekly calls or project reports. A smart phone app will soon allow customers to access their projects real-time. It also enables higher on-time completion rates. Although the GuarD approach cannot promise 100% on-time completion, it has enabled Neuland to make considerable progress towards this goal.

Customer trends: biopharmaceutical companies

Related Content:

The Intersection of Chemistry, Robotics, and AI in Drug Discovery (BIO 2024)

IMAGES

  1. Amazon

    manufacturing project management case studies

  2. Case Study

    manufacturing project management case studies

  3. Case Study Sample Project Management

    manufacturing project management case studies

  4. Project Management Case Studies Harold Kerzner Free Ebook

    manufacturing project management case studies

  5. Case Study Sample Project Management

    manufacturing project management case studies

  6. Case Study Sample Project Management : august 2020 : Real PM/Case Studies

    manufacturing project management case studies

VIDEO

  1. What is Project Business Case? How to Write Good Project Business case & its Importance? Urdu/Hindi

  2. Engineering Project Management Lecture 2 part 2

  3. Industrial relations case study animated video

  4. Manufacturing Industries || project file work for class 10th || Social science || manufacturing ind

  5. Midea Case Study

  6. Project Management: Case Study of Out and Performance Based Road Contract

COMMENTS

  1. Case Study: Project Management for Manufacturing

    Consultport proposed 2 candidates within 24 hours. The client interviewed both candidates and selected a former consultant at Roland Berger with a specialization in PMO consulting and prior experiences working in several large German manufacturing companies. The project manager started working with the client 48 hours after the initial request.

  2. Manufacturing

    New Manufacturing Facility Goes Online in Record Time. PM Solutions is providing project and program management to bring a state-of-the-art, $60 million dollar manufacturing facility online and fully operational in record time. Value Delivered: The facility was operational in just 12 months, allowing the client to realize 33% of their project ...

  3. Project Management Case Studies

    Title: Project management: case studies/Harold Kerzner, Ph.D. Other titles: Project management (Case studies) ... Facilities Scheduling at Mayer Manufacturing 425 Scheduling the Safety Lab 429 Telestar International 431 The Problem with Priorities 433 13 MORALITY AND ETHICS 435 The Project Management Lawsuit 437 ...

  4. Manufacturing Project Management

    Below's the feedback from the manufacturing project management case study. Adam Hirsk, a Head of Product and Head of Research and Development departments at Pacvac company admits: With GanttPRO, we manage our product projects from an idea through to development and production. All the details are well handled by the software.

  5. Project Management Case Studies

    Our collection of featured case studies highlights how organizations are implementing project management practices and using PMI products, programs or services to fulfill business initiatives and overcome challenges. Transportation & Infrastructure, Construction, Government 17 October 2022.

  6. Project Management to Drive a Manufacturing Transition in Pharma

    Project Management to Drive a Manufacturing Transition in Pharma. The supply chain team of an F200 pharma company embarked on a major initiative to transfer manufacturing of products across cell and gene therapy from a commercial site to a contract manufacturing organization (CMO), to develop, manufacture, and commercialize therapies in ...

  7. Project Management Case Studies

    PMAlliance project management consulting case studies. A manufacturing company asked PMAlliance to redirect its efforts to implement new strategic projects that would increase sales and profitability.

  8. Lean Management Case Studies Library

    The following case studies of lean management principles in action show you how a variety of real businesses solved real business problems under diverse conditions. ... a "Lean Manufacturing" case study may also appear with "Privately Held Companies." ... Lean Design and Construction Project an Extension of Lean Commitment at Akron ...

  9. Project Management Case Studies

    The latest edition in the gold standard of project management case study collections As a critical part of any successful, competitive business, project management sits at the intersection of several functional areas. And in the newly revised Sixth Edition of Project Management Case Studies, world-renowned project management professional Dr. Harold Kerzner delivers practical and in-depth ...

  10. Project Management Case Studies, Fourth Edition

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a "super case" on the Iridium Project ... 8 PROJECT SCHEDULING 265. Crosby Manufacturing Corporation 267. The Scheduling Dilemma 270. 9 PROJECT EXECUTION 275. The Blue Spider Project 277. Corwin Corporation 293. Quantum ...

  11. Project Management: Case Studies, 4th Edition

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a super case on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzners Project Management Case Studies features a number of new cases covering value measurement in project management. Also ...

  12. Top 20 Project Management Case Studies [With Examples]

    The Opera House stands as a symbol of perseverance and successful project management in the face of humankind. 2. The Airbus A380 Project. The Airbus A380 Project is a project management case study showcasing the challenges encountered during developing and producing the world's largest commercial aircraft.

  13. Fighting a global pandemic

    AstraZeneca: Fighting a global pandemic (2021). Under intense pressure during the global pandemic, AstraZeneca met the global need for Covid-19 vaccines by leveraging PMI standards. AstraZeneca partnered with the University of Oxford to address the vaccine problem; this work included managing clinical trials while simultaneously ramping up ...

  14. Project Management Case Studies, 6th Edition

    The latest edition in the gold standard of project management case study collections As a critical part of any successful, competitive business, project management sits at the intersection of several functional areas. And in the newly revised Sixth Edition of Project Management Case Studies, world-renowned project management professional Dr. Harold Kerzner delivers practical and in-depth ...

  15. Industry 4.0: Digital transformation in manufacturing

    In the past five years, a select group of companies have started pulling ahead in their efforts to implement Industry 4.0 across their manufacturing networks. Leading manufacturers are now realizing significant value from data and analytics, AI, and machine learning (ML). However, a large majority remain stuck in pilot purgatory, struggling to ...

  16. Project Management Case Studies

    The Project Management Experts® PM Solutions is a project management services firm helping organizations apply project management and PMO practices to improve business performance. Toll-free (US): 800.983.0388 International: +1.484.450.0100 [email protected]. 285 Wilmington-West Chester Pike Chadds Ford, PA 19317 USA

  17. Manufacturing Operations Management for Smart Manufacturing

    Abstract. Industry 4.0 was introduced early in the last decade. That introduction spawned related concepts like "Smart Manufacturing" and digitalization, as well as a proliferation of digital manufacturing technologies for supporting systems. The industry experienced widespread puzzlement over how to apply these concepts in practice and ...

  18. SCM Case Studies With Examples & Solutions

    They cover different aspects of supply chain management and feature a broad range of companies and situations. SCM case study examples would include an SCM selection project for a manufacturer, or an SCM implementation for a distributor or logistics provider. SCM case studies also feature TEC's own case studies, showing how we've helped ...

  19. Actalent's Team gets Multi-Site Plant Expansions on Track

    Actalent's Project Management Team Gets Multi-Site Plant Expansions Back on Track By Michael McGuire | May 31, 2024 This case study showcases Actalent's wide range of expertise and capabilities: from project management, construction management and EHS programs to manufacturing, mechanical, and electrical engineering solutions.

  20. Project Management Case Studies, 5th Edition

    THE #1 PROJECT MANAGEMENT CASE STUDIES BOOK NOW FEATURING NEW CASES FROM DISNEY, THE OLYMPICS, AIRBUS, BOEING, AND MORE After on-the-job experience, case studies are the most important part of every project manager's training. ... 8 PROJECT SCHEDULING 201. Crosby Manufacturing Corporation 203. The Scheduling Dilemma 207. 9 PROJECT EXECUTION 211 ...

  21. Project Management Case Studies

    HAROLD KERZNER, PHD, is Senior Executive Director for Project Management at the International Institute for Learning, Inc. (IIL), a global learning solutions company offering professional training and consulting services worldwide. Dr. Kerzner's profound effect on the project management industry inspired IIL to establish, in coordination with the Project Management Institute (PMI), the Kerzner ...

  22. Top 15 Project Management Case Studies with Examples

    The construction project management case study we discussed demonstrated the benefits of flexibility, collaboration, and communication in emergency response. 7. Appetize Doubles Length of Forecasting Outlook with Mavenlink. Here the the benefits Appetize got with Mavenlink: Forecasting horizon increases to 12 weeks.

  23. Academic Project Management Case Studies

    The project management case studies listed below place the students in the position of the project manager, sponsor, and other stakeholders. Students develop problem solving skills by critically analyzing the various scenarios. The case studies are broken down to allow for easy integration with the various lecture topics of PM-1.

  24. Case Studies in Pharmaceutical Project Management

    Case Studies in Pharmaceutical Project Management. Published on: January 31, 2012. Patricia Van Arnum. Pharmaceutical Technology, Pharmaceutical Technology-02-01-2012, Volume 2012 Supplement, Issue 1. A technical forum featuring Catalent Pharma Solutions, SAFC, and Neuland Laboratories. Effective project management is an invaluable competency ...